Lilbourne Wind Farm

Lilbourne Wind Farm is an operational 10 MW onshore wind farm in West Northamptonshire, generating since 15 December 2014. Planning permission was granted on 6 July 2012, 33 months after submission. Operator of record: Cetis.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 15 December 2014
Wind Onshore
Technology
Cetis
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted15 October 2009
Permission granted6 July 2012
33 months after submission
Operational15 December 2014
29 months after consent

Screening a site of your own?

RedlineUK · £39

West Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lilbourne Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Northamptonshire’s record on onshore wind

West Northamptonshire has decided 12 onshore wind schemes and approved 67%, taking a median of 17.6 months. See every onshore wind scheme decision in West Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
201.9 km
Wind Onshore · Operational
222 km
Wind Onshore · Operational
162.4 km
Landfill Gas · Operational
2.34.4 km
Solar Photovoltaics · Under Construction
49.94.4 km
Wind Onshore · Operational
45 km
Solar Photovoltaics · Operational
265.4 km
Wind Onshore · Operational
12.37.8 km

How big is Lilbourne Wind Farm?

Lilbourne Wind Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lilbourne Wind Farm?

REPD records the operator as Cetis. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lilbourne Wind Farm approved and built?

The application was submitted on 15 October 2009. Permission was granted on 6 July 2012, 33 months later. The site became operational on 15 December 2014, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3814.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode