Renewable sitesKilsby Landfill Scheme

Kilsby Landfill Scheme

Kilsby Landfill Scheme is operational in West Northamptonshire with a recorded capacity of 1 MW, and has been generating since 1998-11-05.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1998-11-05
Landfill Gas
Technology
Hales Waste Control Ltd
West Northamptonshire
Authority
England

Planning and build timeline

Application submitted1997-10-10
Permission granted1998-02-12
4 months after submission
Operational1998-11-05
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
M1 J18 Wind Turbines
Wind Onshore · Operational
43.3 km
Watford Lodge
Wind Onshore · Operational
12.54.2 km
Crick Road
Solar Photovoltaics · Under Construction
49.94.9 km
Yelvertoft Wind Farm
Wind Onshore · Operational
166.1 km
Royal Oak Way South - Solar Array
Solar Photovoltaics · Operational
1.666.5 km
Daventry
Biomass (dedicated) · Operational
17.3 km
Lilbourne Wind Farm
Wind Onshore · Operational
108.2 km
Winwick
Wind Onshore · Operational
12.38.8 km

How big is Kilsby Landfill Scheme?

Kilsby Landfill Scheme has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kilsby Landfill Scheme?

REPD records the operator as Hales Waste Control Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kilsby Landfill Scheme approved and built?

The application was submitted on 1997-10-10. Permission was granted on 1998-02-12, 4 months later. The site became operational on 1998-11-05, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 535.