Woodtown Farm

Woodtown Farm is operational in Dorset with a recorded capacity of 3.8 MW, and has been generating since 2015-12-23.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-23
Solar Photovoltaics
Technology
Woodtown Solar Limited
Dorset
Authority
England

Planning and build timeline

Application submitted2014-10-24
Permission granted2015-10-14
12 months after submission
Operational2015-12-23
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Hale Farm
Solar Photovoltaics · Operational
80.6 km
Eco Composting
Biomass (dedicated) · Operational
3.21.5 km
Chapel Lane Parley Solar Farm Phase 1
Solar Photovoltaics · Operational
201.9 km
Chapel Lane ERF
EfW Incineration · Under Construction
3.42 km
Chapel Lane Parley Solar Farm Phase 2
Solar Photovoltaics · Operational
362.4 km
Chapel Lane Parley Solar Farm Phase 3
Solar Photovoltaics · Operational
43 km
Dorset Green Solar Farm
Solar Photovoltaics · Operational
55.6 km
Dorset Green Battery
Battery · Operational
5.6 km

How big is Woodtown Farm?

Woodtown Farm has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Woodtown Farm?

REPD records the operator as Woodtown Solar Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Woodtown Farm approved and built?

The application was submitted on 2014-10-24. Permission was granted on 2015-10-14, 12 months later. The site became operational on 2015-12-23, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4761.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council