Novarly ParcelRenewable planning

Renewable planning SolarDorset

Solar planning in Dorset

Dorset has decided 97 solar farms and approved 95% of them, taking a median of 3.7 months to decide. Consented capacity: 591 MW. 11 applications still awaiting a decision.

95%
Approved
92 granted · 5 refused
3.7 mo
Median decision
UK 2.3 mo
591 MW
Consented
58 MW refused
6
Appeals
4 allowed on appeal

How Dorset compares

Against the 298 UK authorities with 5+ solar decisions, Dorset sits in the 43rd percentile for approval rate (2 points above the England average) and the 19th percentile for speed.

Decisions by year

1020Approved — 4 (2011)411Approved — 4 (2012)412Approved — 11 (2013)Refused — 1 (2013)1213Approved — 10 (2014)Refused — 1 (2014)1114Approved — 6 (2015)615Approved — 5 (2016)Refused — 1 (2016)616Approved — 1 (2020)120Approved — 7 (2021)721Approved — 15 (2022)1522Approved — 17 (2023)1723Approved — 3 (2024)324Approved — 9 (2025)Refused — 1 (2025)1025
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (117)

SchemeMWStatusDecided
Cruxton Farm - Solar Farm
Environmental Asset Management · P/FUL/2025/00485 · 6.2 mo to decide
12Application Refused2025-10-16
Waterside Holiday Park, Bowleaze Coveway - Solar Arrays
Waterside Holiday Group Ltd · P/FUL/2025/04477
Application Submitted2025-09-16
Dorset Innovation Park, Newburgh - Solar Panels
Atlas Elektronik UK Limited · P/PASO/2025/04392 · 1.1 mo to decide
0.17Awaiting Construction2025-08-26
Caswell Farm, Common Lane - Solar Farm
GridSource Limited · P/FUL/2025/03066
40Application Submitted2025-08-19
Motcombe Road, Motcombe - Solar Pv Arrays
Enviromena · P/FUL/2025/03674
12Application Submitted2025-07-29
Tecan Way, Granby Industrial Estate - Ground Mounted Solar Panels
P L Cane Investments Limited · P/FUL/2025/00525 · 3.4 mo to decide
Awaiting Construction2025-06-09
Damers First School - Solar Panels
Solar Options for Schools Limited · P/PASO/2025/01529 · 2.1 mo to decide
0.19Awaiting Construction2025-05-21
Woodlands Manor Farm, Horton - Solar Farm
BayWa r.e. UKLimited / Gr�ne Energien Projekt UG · P/FUL/2023/03415 · 22.7 mo to decide
30Awaiting Construction2025-05-07
North Farm, Horton - Solar Farm
North Farm Mannington Solar Limited / BayWa r.e. · P/FUL/2023/02829 · 23.7 mo to decide
19Awaiting Construction2025-05-07
Thomas Hardye School - Solar Panels
Solar Options for Schools Limited · P/PASO/2025/01614 · 1.2 mo to decide
0.59Awaiting Construction2025-05-01
Merck, The Old Brickyard - Solar Photo-Voltaic Modules
Ineco Energy Limited · P/PASO/2025/01369 · 1.5 mo to decide
0.69Awaiting Construction2025-04-22
The Purbeck School, Worgret Road - Solar Photovoltaic Panels
Solar Options for Schools Limited · P/PASO/2025/01391 · 1 mo to decide
0.14Awaiting Construction2025-04-10
Sainsburys Supermarket, Ringwood Road - Solar Panels
Sainsburys Supermarkets Limited · P/PASO/2025/00593 · 1.7 mo to decide
0.43Awaiting Construction2025-03-27
Copse Barn, Wytherston Farm - Solar Panels
Private Developer · P/PASO/2023/03071 · 13 mo to decide
0.15Awaiting Construction2024-07-30
Dextra Group, Brickfields Business Park - Solar PV Systems
Dextra Group · P/PASO/2024/01181 · 1.2 mo to decide
0.18Awaiting Construction2024-04-08
St Giles House, Creech Hill - Solar Panels
Shaftesbury Estates · P/FUL/2023/05478 · 1.8 mo to decide
0.15Awaiting Construction2024-01-29
Lower Silton, Fantley Lane - Solar Panels
Sungift Solar Limited · P/FUL/2023/04798
0.19Application Withdrawn2023-11-24
Highlands End Holiday Park, Highlands End -Solar PV Panels
Highlands End Farm Caravan Park Limited · P/FUL/2023/00384 · 8.5 mo to decide
0.2Awaiting Construction2023-10-27
Bridec Melamine Boards, West Bay Road - Solar Panels
Bridec Melamine Boards Limited · P/FUL/2023/03426 · 1.8 mo to decide
0.2Awaiting Construction2023-08-10
Brickfields Business Park, Unit 17 - Solar panels
Dextra Lighting Systems Plc · P/PASO/2022/06287 · 9.5 mo to decide
0.62Under Construction2023-07-27
Riversmeet, Hardings Lane - Solar Panels
Conrad Energy (Developments) Limited · P/PASO/2023/02617 · 1.6 mo to decide
0.25Awaiting Construction2023-06-22
Prince Of Wales Road - Solar Photovoltaic Equipment
Solar South West Limited · P/PASO/2023/02406 · 1.6 mo to decide
0.2Awaiting Construction2023-06-22
Birchwood Tourist Park, Bere Road - Solar PV Panels
Birchwood Tourist Park · P/FUL/2023/00475 · 4.6 mo to decide
0.2Awaiting Construction2023-06-15
Tecan Way, Granby Industrial Estate - Solar Photo Voltaic Panels
P L Cane Investments Limited · P/PASO/2023/02526 · 1.4 mo to decide
1Awaiting Construction2023-06-09
Brickfields Business Park, Unit 16 - Solar Panels
Dextra Lighting Systems Plc · P/PASO/2022/06222 · 7.5 mo to decide
0.17Under Construction2023-05-25
Brickfields Business Park, Unit 35 - Solar Panels
Dextra Lighting Systems Plc · P/PASO/2022/06178 · 7.3 mo to decide
0.33Under Construction2023-05-17
Brickfields Business Park, Unit 24 - Solar panels
Dextra Lighting Systems Plc · P/PASO/2022/06286 · 7 mo to decide
0.16Under Construction2023-05-12
Bridec Melamine Boards, West Bay Road - Solar Panels
Bridec Melamine Boards Limited · P/PASO/2023/01399
0.24Revised2023-05-09
Golden Cap Holiday Park, Seatown - Solar Panels
West Dorset Leisure Holidays Limited · P/FUL/2022/07144 · 5.5 mo to decide
0.27Awaiting Construction2023-05-03
Tecan Way, Granby Industrial Estate - Solar Panels
Tecan Limited · P/PASO/2023/01265
0.22Revised2023-04-05
Galton Manor Farm - Solar Farm
Spring Dev 05 Limited · P/FUL/2022/02429 · 11.5 mo to decide
30Awaiting Construction2023-03-30
Atrim Road, Dottery - Solar Panels
Dorset Community Energy & Local Energy Bridport · P/FUL/2022/05708 · 5.5 mo to decide
0.25Awaiting Construction2023-02-28
Wraxall Road, Higher Wraxall - Solar Farm
British Solar Renewables · P/FUL/2023/00953
13.5Application Submitted2023-02-16
Fernbrook - Solar farm & Battery storage
Low Carbon UK Solar Investment Company Limited · P/FUL/2021/02046 · 19.4 mo to decide
49.9Awaiting Construction2023-02-13
Seaview Holiday Park,Preston Road- Solar Photovoltaics Panels
Bourne Leisure Limited · P/PASO/2022/07810 · 1.7 mo to decide
0.2Awaiting Construction2023-02-02
Littlesea Holiday Park, Lynch Lane - Solar photovoltaics
Bourne Leisure Limited · P/PASO/2022/07800 · 1.7 mo to decide
0.28Awaiting Construction2023-02-02
Hospital Metalcraft, Blandford Heights Industrial Estate - Solar Panels
Hospital Metalcraft Limited · P/PASO/2022/07365 · 1.6 mo to decide
Awaiting Construction2023-01-17
Wessex Water Palmersford Sewage Treatment, Humber Road - Solar Panels
Wessex Water · P/CLP/2022/07327
Application Withdrawn2023-01-11
Morrisons Supermarket, Dorchester Road - Solar Panels
Morrisons · P/PASO/2022/06703 · 1 mo to decide
0.38Awaiting Construction2022-11-25
Cumberland Drive, Granby Industrial Estate - Solar Panels
JCA Engineering Limited · P/PASO/2022/06191 · 1.5 mo to decide
0.17Awaiting Construction2022-11-21
Sandford Holiday Park, Organford Road - Solar Panels
Parkdean Resorts · P/PASO/2022/05898 · 1.7 mo to decide
0.25Awaiting Construction2022-11-15
Cruxton Farm - Solar Farm
Environmental Asset Management · P/FUL/2021/01920 · 17.2 mo to decide
11.8Revised2022-11-08
Warmwell Leisure Resort, Warmwell Road - Solar Panels
Parkdean Properties Limited · P/PASO/2022/05857 · 1.1 mo to decide
0.28Awaiting Construction2022-10-26
Dorchesters Corn Exchange - Solar Panels & Biomass Boiler
Dorchester Town Council · P/FUL/2021/05705 · 9.4 mo to decide
Under Construction2022-10-05
High East - Solar Panels
21st Century Homes · P/FUL/2022/03964 · 2.2 mo to decide
0.26Awaiting Construction2022-09-02
Chickerell - Solar Photovoltaics Panel
Newsquest Media Group · P/PASO/2022/03357 · 1.7 mo to decide
0.3Awaiting Construction2022-07-19
Chickerell Road, Chickerell - Solar Photovoltaics (PV) Equipment
Dorset Council - Assets and Property · P/PASO/2021/05147 · 4.2 mo to decide
Operational2022-04-07
Highlands End, Eype - Solar Panel Photovoltaic Solar Arrays
Highlands End Farm Caravan Park Limited · P/FUL/2021/03350 · 6.3 mo to decide
0.2Revised2022-03-18
Blandford Hill - EV Charging Station & Solar Farm
Naturalis Energy Developments Limited · P/FUL/2021/02622 · 6 mo to decide
15Awaiting Construction2022-01-26
North Fossil Farm - Solar Panels
Spring Dev 03 Ltd · 6/2020/0595 · 11.7 mo to decide
40Awaiting Construction2022-01-12
Shrubbery Lane - Solar Photovoltaic Panels
Dorset County Council · P/PASO/2021/05151 · 1.2 mo to decide
0.15Awaiting Construction2022-01-05
Jubilee Close - Solar photovoltaics
Dorset Council - Assets and Property · P/PASO/2021/05136 · 1.2 mo to decide
0.2Awaiting Construction2022-01-05
Cherry Grove - Solar Panels
Dorset Council - Assets and Property · P/PASO/2021/05169 · 1.1 mo to decide
0.24Awaiting Construction2022-01-04
Ferndown Upper School - Solar Array
Dorset County Council · P/PASO/2021/05165 · 1.1 mo to decide
0.26Awaiting Construction2022-01-04
Sandford Road, Sandford - Solar Photovoltaics PV Equipment
Dorset Council Assets & Property · P/PASO/2021/05168 · 1.1 mo to decide
0.19Awaiting Construction2022-01-04
Higher Stockbridge Farm
Voltalia UK · WD/D/19/003181 · 23.5 mo to decide
35Awaiting Construction2021-12-08
The Purbeck School - Solar panels
Dorset County Council · P/PASO/2021/03636 · 1.8 mo to decide
0.27Awaiting Construction2021-11-17
Conifers Primary School - Solar Photovoltaics
Dorset County Council · P/PASO/2021/03531 · 1.7 mo to decide
Awaiting Construction2021-11-12
County Hall - Solar Panels
Dorset County Council · P/PASO/2021/03546 · 1.7 mo to decide
0.2Awaiting Construction2021-11-12
Clifton Farm
Voltalia UK · WD/D/20/001057 · 12.5 mo to decide
35Operational2021-05-20
Weymouth College Solar Panels
Weymouth College · WP/21/00123/SOL · 3 mo to decide
0.47Awaiting Construction2021-05-06
North Dairy Farm Solar Farm
British Solar Renewables · P/FUL/2021/01018
30Application Submitted2021-04-15
Stokeford Farm
Private Developer · 6/2020/0158 · 9.9 mo to decide
12Revised2021-02-26
Burton Bradstock Solar Panels
Geoffrey Joy · WD/D/20/002595 · 2.5 mo to decide
Under Construction2021-01-06
South Farm Solar Park
Voltalia UK · 2/2019/0850/PAEIA · 12.2 mo to decide
40Operational2020-06-25
Higher Farm
NextPower Higher Farm Limited · 2/2019/0470/FUL
11Appeal Refused2019-04-01
Mapperton Farm
Good Energy Generation · 3/13/0681/FUL
24Application Withdrawn2018-06-11
The Down House
British Solar Renewables · 2/2015/1129/PAEIA · 18.5 mo to decide
5Abandoned2017-03-31
Rampisham Down Transmitting Station
Higher Hill Farm Partnership · 1/D/12/001664
24Application Withdrawn2017-02-20
Rampisham North
British Solar Renewables · WD/D/14/002974 · 25.1 mo to decide
5Operational2016-12-22
Galton Manor Solar Park
British Solar Renewables · WD/D/15/001708 · 13.8 mo to decide
5Operational2016-09-07
Land at East Farm
East Farm Solar Park Ltd · WD/D/15/001858 · 13.3 mo to decide
5Operational2016-09-06
Gashay Lane
Sadborow Solar Parks · WD/D/15/001863 · 6.4 mo to decide
5Application Refused2016-04-28
Alton Mead Lane
Brilliant Harvest Installations · WD/D/15/001841 · 4.4 mo to decide
5Planning Permission Expired2016-01-18
Southern Counties Shooting Ground Phase 2
British Solar Renewables · WD/D/15/001862 · 4 mo to decide
5Operational2016-01-08
Holly Farm Solar Park
British Solar Renewables · WD/D/15/001856 · 4.7 mo to decide
5Operational2015-12-18
Warren Park Solar Farm
Good Energy · 3/15/1020/FUL · 2.9 mo to decide
5Planning Permission Expired2015-12-17
Stokeford Farm
Alaska (The Holme Estate) · 6/2015/0516 · 2.3 mo to decide
28.5Operational2015-10-28
Woodtown Farm
Woodtown Solar Limited · 3/14/0956/FUL · 11.7 mo to decide
3.8Operational2015-10-14
Land at Stalbridge Park
British Solar Renewables / NextEnergy Solar Fund (NESF) · 2/2015/0898/FUL · 3.4 mo to decide
5Operational2015-10-13
Independent Quarries
The Crown Estate and Albion Stone · WP/15/00039/FUL · 7.4 mo to decide
3Abandoned2015-09-30
Southern Counties Shooting Ground Phase 1
British Solar Renewables / NextEenrgy Solar Fund (NESF) · WD/D/14/003367 · 8.5 mo to decide
9Operational2015-09-08
Southern Counties Shooting Ground
British Solar Renewables · WD/D/14/001307 · 6.9 mo to decide
8.8Revised2014-12-17
Land at Newlands Farm
British Solar Renewables · WD/D/14/002675 · 2.1 mo to decide
5Operational2014-12-17
Littleton
Lightsource Renewable Energy · 2/2014/1066/FUL · 2.5 mo to decide
12.1Operational2014-12-09
North Farm (Spetisbury)
British Solar Renewables · 2/2014/0825/FUL · 3 mo to decide
11.6Operational2014-11-12
Yellowham solar park
Wessex Solar Energy · WD/D/14/001496 · 4.9 mo to decide
20Appeal Refused2014-11-07
Oaklands Plantation
Eneco UK · 6/2014/0338 · 4.3 mo to decide
5Operational2014-11-07
Cross Roads Plantation
Good Energy Generation · 3/14/0774/FUL · 2.5 mo to decide
5Operational2014-11-04
Bedborough Farm
Solstice Renewables Ltd · 3/14/0790/FUL · 2.7 mo to decide
7Operational2014-11-03
Verwood Solar Farm
Foresight · 3/14/0457/FUL · 3.5 mo to decide
20.4Operational2014-07-31
Henbury Quarry
Lightsource Renewable Energy · 3/13/0948/FUL · 8.2 mo to decide
3.9Operational2014-05-28
Canada Farm
British Solar Renewables · 2/2013/0770/PLNG · 8 mo to decide
8.3Operational2014-03-10
Wedgehill Farm
Orta Solar · 3/13/0669/FUL · 5.9 mo to decide
13Operational2014-01-17
Caswell Farm Solar Park
Juwi Renewable Energies · 1/D/13/000242 · 9.2 mo to decide
6.7Operational2013-12-13
Woolbridge Solar Park
Good Energy Generation · 6/2013/0446 · 4.2 mo to decide
5Operational2013-12-10
Corton Farm
Corton Farm Solar Park Ltd · 1/D/13/000772 · 5.7 mo to decide
10Application Refused2013-11-26
Manor Farm (Dorset)
INRG Solar · 2/2013/0791/PLNG · 3.1 mo to decide
5Operational2013-11-08
Bottom Plain
Inazin Energy/Low Carbon · 6/2013/0443 · 3 mo to decide
10Operational2013-11-01
Bourne Park (Solar)
Sovereign Energy Partners LLP · 1/D/13/001116 · 2.7 mo to decide
5Operational2013-10-30
Bourne Farm
Farm Power Apollo · 1/D/13/001044 · 2.4 mo to decide
2.4Operational2013-10-14
Homeland Solar Farm
Foresight · 3/13/0470/FUL · 4.4 mo to decide
13.2Operational2013-10-08
The Ferns
Private Developer · 2/2013/0442/PLNG · 1.8 mo to decide
1.5Abandoned2013-07-09
Race farm
Equitix · 6/2013/0132 · 3.7 mo to decide
6.1Operational2013-06-28
North of Newton Farm
Primrose Solar · 6/2013/0133 · 3.7 mo to decide
3Operational2013-06-28
South Newton Farm
Equitix · 6/2013/0134 · 3.7 mo to decide
11.3Operational2013-06-28
Rudge Hill Farm
Lightsource Renewable Energy · 2/2012/0253/PLNG · 11.1 mo to decide
1.5Operational2013-02-20
Trigon Solar Farm
Trigon Solar Farm Ltd · 6/2012/0415 · 4.8 mo to decide
7Operational2012-11-28
Dolmans Hill (Redbridge Farm) Solar Arrays
Emotion Energy (Bournemouth) Limited · 6/2012/0228 · 7.2 mo to decide
5Operational2012-11-08
Slaughtergate Farm
Lightsource Renewable Energy · 2/2012/1042/PLNG · 2.2 mo to decide
1.8Operational2012-11-06
NOTTINGTON LANE SOLAR FARM
PS Renewables · 1/D/12/000858 · 3.7 mo to decide
5Operational2012-09-20
Solar Farm
Lightsource Renewable Energy · 1/D/12/000430 · 4.9 mo to decide
1.5Abandoned2012-09-14
OKEFORD FITZPAINE - SOLAR FARM
Private Developer · 2/2012/0254/PLNG
1.5Application Withdrawn2012-05-29
Stour Row Solar Farm
Allied Renewables · 2/2011/0713/PLNG · 2.6 mo to decide
12Planning Permission Expired2011-08-24
Crossways Pit Solar Farm
NextEnery Solar Fund (NESF) · 1/D/11/000168 · 5.9 mo to decide
5Operational2011-08-23
Wyld Meadow Solar Farm
NextEnery Solar Fund (NESF) · 1/D/11/000453 · 3 mo to decide
4.8Operational2011-07-13
Park Farm
Low Carbon Solar · 2/2011/0304/PLNG · 1.4 mo to decide
4Operational2011-05-04

Does Dorset approve solar farms?

Yes — of the 97 solar farms Dorset has decided, 95% were approved (92 granted, 5 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Dorset?

The median time from application to decision is 3.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Dorset consented?

591 MW has been consented across 92 approved schemes, with 58 MW refused. A further 11 applications awaits a decision.

Other technologies in Dorset

Battery storage in DorsetOnshore wind in Dorset

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report