Chapel Lane Parley Solar Farm Phase 1 is an operational 20 MW solar farm in Bournemouth, Christchurch and Poole, generating since 31 March 2014. Planning permission was granted on 28 March 2013, 4 months after submission. Operator of record: Solar Power Generation Limited.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Solar Photovoltaics
Technology
Solar Power Generation Limited
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted28 November 2012
Permission granted28 March 2013
4 months after submission
Operational31 March 2014
12 months after consent

Screening a site of your own?

RedlineUK · £39

Bournemouth, Christchurch and Poole approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chapel Lane Parley Solar Farm Phase 1’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bournemouth, Christchurch and Poole’s record on solar

Bournemouth, Christchurch and Poole has decided 25 solar farms and approved 88%, taking a median of 2.3 months. See every solar farm decision in Bournemouth, Christchurch and Poole

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
360.6 km
EfW Incineration · Under Construction
3.40.6 km
Biomass (dedicated) · Operational
3.20.7 km
Solar Photovoltaics · Operational
41.3 km
Solar Photovoltaics · Operational
81.5 km
Solar Photovoltaics · Operational
3.81.9 km
Solar Photovoltaics · Operational
75.3 km
Solar Photovoltaics · Operational
13.26.2 km

How big is Chapel Lane Parley Solar Farm Phase 1?

Chapel Lane Parley Solar Farm Phase 1 has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chapel Lane Parley Solar Farm Phase 1?

REPD records the operator as Solar Power Generation Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chapel Lane Parley Solar Farm Phase 1 approved and built?

The application was submitted on 28 November 2012. Permission was granted on 28 March 2013, 4 months later. The site became operational on 31 March 2014, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2282.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode