Chapel Lane Parley Solar Farm Phase 3

Chapel Lane Parley Solar Farm Phase 3 is an operational 4 MW solar farm in Bournemouth, Christchurch and Poole, generating since 1 September 2015. Planning permission was granted on 30 January 2015, 5 months after submission. Operator of record: Eco Sustainable Solutions.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2015
Solar Photovoltaics
Technology
Eco Sustainable Solutions
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted28 August 2014
Permission granted30 January 2015
5 months after submission
Operational1 September 2015
7 months after consent

Screening a site of your own?

RedlineUK · £39

Bournemouth, Christchurch and Poole approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chapel Lane Parley Solar Farm Phase 3’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bournemouth, Christchurch and Poole’s record on solar

Bournemouth, Christchurch and Poole has decided 25 solar farms and approved 88%, taking a median of 2.3 months. See every solar farm decision in Bournemouth, Christchurch and Poole

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
361 km
Solar Photovoltaics · Operational
201.3 km
EfW Incineration · Under Construction
3.41.7 km
Biomass (dedicated) · Operational
3.22 km
Solar Photovoltaics · Operational
82.8 km
Solar Photovoltaics · Operational
3.83 km
Solar Photovoltaics · Operational
74.5 km
Solar Photovoltaics · Operational
13.24.9 km

How big is Chapel Lane Parley Solar Farm Phase 3?

Chapel Lane Parley Solar Farm Phase 3 has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chapel Lane Parley Solar Farm Phase 3?

REPD records the operator as Eco Sustainable Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chapel Lane Parley Solar Farm Phase 3 approved and built?

The application was submitted on 28 August 2014. Permission was granted on 30 January 2015, 5 months later. The site became operational on 1 September 2015, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2234.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode