Renewable sites › Douglas West Wind Farm (extension)
Douglas West Wind Farm (extension)
Douglas West Wind Farm (extension) is under construction in Scotland with a recorded capacity of 20 MW.
Planning and build timeline
| Application submitted | 2019-04-12 |
| Permission granted | 2021-11-18 31 months after submission |
| Operational | not recorded |
Scottish Government (S36)’s record on battery storage
Scottish Government (S36) has decided 108 battery storage schemes and approved 94%, taking a median of 17.3 months. See every battery storage scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Douglas West Wind Farm (extension) Wind Onshore · Under Construction | 78 | 0 km |
Douglas West and Dalquhandy Renewable Energy Project Wind Onshore · Operational | 45 | 0 km |
Cumberhead West Wind Farm Wind Onshore · Under Construction | 126 | 1.3 km |
Cumberhead West Wind Farm Battery · Under Construction | 40 | 1.3 km |
Nutberry Wind Farm Wind Onshore · Operational | 15 | 2.4 km |
Hagshaw Hill Wind Farm Extension Wind Onshore · Operational | 26 | 3 km |
Hazelside farm Wind Onshore · Under Construction | 1.6 | 3.3 km |
Coalburn Energy - Battery Storage Battery · Under Construction | 500 | 3.7 km |
How big is Douglas West Wind Farm (extension)?
Douglas West Wind Farm (extension) has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Douglas West Wind Farm (extension)?
REPD records the operator as ScottishPower Renewables (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Douglas West Wind Farm (extension) approved and built?
The application was submitted on 2019-04-12. Permission was granted on 2021-11-18, 31 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9957.
Novarly Parcel · official public data, read properly · parcel.novarly.com