Withyhedge Generation Plant

Withyhedge Generation Plant is operational in Pembrokeshire with a recorded capacity of 2.4 MW, and has been generating since 2007-09-01.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-09-01
Landfill Gas
Technology
Unknown
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted1999-12-06
Permission granted2000-03-07
3 months after submission
Operational2007-09-01
90 months after consent

Other built sites within 15 km

SiteMWDistance
Rudbaxton Solar Park
Solar Photovoltaics · Operational
10.80.8 km
Puffin Produce - Solar Panels
Solar Photovoltaics · Operational
3.8 km
Crundale / Fenton Home Farm (extension)
Solar Photovoltaics · Operational
5.94.1 km
Fenton Home Farm
Solar Photovoltaics · Operational
31.34.8 km
Shoals Hook Farm
Solar Photovoltaics · Operational
12.15 km
Cuckoo Grove Farm
Solar Photovoltaics · Operational
6.16.5 km
Oak Cottage
Solar Photovoltaics · Operational
4.97.3 km
AMBLESTON SOLAR PANELS
Solar Photovoltaics · Operational
67.5 km

How big is Withyhedge Generation Plant?

Withyhedge Generation Plant has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Withyhedge Generation Plant?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Withyhedge Generation Plant approved and built?

The application was submitted on 1999-12-06. Permission was granted on 2000-03-07, 3 months later. The site became operational on 2007-09-01, 90 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 603.