AMBLESTON SOLAR PANELS

AMBLESTON SOLAR PANELS is operational in Pembrokeshire with a recorded capacity of 6 MW, and has been generating since 2012-01-25.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-01-25
Solar Photovoltaics
Technology
Arqiva Ltd
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2011-06-16
Permission granted2011-08-11
2 months after submission
Operational2012-01-25
5 months after consent

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Withyhedge Generation Plant
Landfill Gas · Operational
2.47.5 km
Rudbaxton Solar Park
Solar Photovoltaics · Operational
10.88.1 km
Oak Cottage
Solar Photovoltaics · Operational
4.98.5 km
Crundale / Fenton Home Farm (extension)
Solar Photovoltaics · Operational
5.99.4 km
Fenton Home Farm
Solar Photovoltaics · Operational
31.39.6 km
Puffin Produce - Solar Panels
Solar Photovoltaics · Operational
10.5 km
Shoals Hook Farm
Solar Photovoltaics · Operational
12.110.9 km
Langton Farm Solar park
Solar Photovoltaics · Operational
4.411.4 km

How big is AMBLESTON SOLAR PANELS?

AMBLESTON SOLAR PANELS has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates AMBLESTON SOLAR PANELS?

REPD records the operator as Arqiva Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was AMBLESTON SOLAR PANELS approved and built?

The application was submitted on 2011-06-16. Permission was granted on 2011-08-11, 2 months later. The site became operational on 2012-01-25, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1623.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council