Renewable sitesAMBLESTON SOLAR PANELS

AMBLESTON SOLAR PANELS

AMBLESTON SOLAR PANELS is an operational 6 MW solar farm in Pembrokeshire, generating since 25 January 2012. Planning permission was granted on 11 August 2011, 2 months after submission. Operator of record: Arqiva Ltd.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 25 January 2012
Solar Photovoltaics
Technology
Arqiva Ltd
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted16 June 2011
Permission granted11 August 2011
2 months after submission
Operational25 January 2012
5 months after consent

Screening a site of your own?

RedlineUK · £39

Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with AMBLESTON SOLAR PANELS’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.47.5 km
Solar Photovoltaics · Operational
10.88.1 km
Solar Photovoltaics · Operational
4.98.5 km
Solar Photovoltaics · Operational
5.99.4 km
Solar Photovoltaics · Operational
31.39.6 km
Solar Photovoltaics · Operational
10.5 km
Solar Photovoltaics · Operational
12.110.9 km
Solar Photovoltaics · Operational
4.411.4 km

How big is AMBLESTON SOLAR PANELS?

AMBLESTON SOLAR PANELS has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates AMBLESTON SOLAR PANELS?

REPD records the operator as Arqiva Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was AMBLESTON SOLAR PANELS approved and built?

The application was submitted on 16 June 2011. Permission was granted on 11 August 2011, 2 months later. The site became operational on 25 January 2012, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1623.