Renewable sites › Shoals Hook Farm
Shoals Hook Farm
Shoals Hook Farm is an operational 12.1 MW solar farm in Pembrokeshire, generating since 31 March 2015. Planning permission was granted on 3 October 2014, 5 months after submission. Operator of record: John Laing Environmental Assets Group.
Planning and build timeline
| Application submitted | 6 May 2014 |
| Permission granted | 3 October 2014 5 months after submission |
| Operational | 31 March 2015 6 months after consent |
Screening a site of your own?
Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Shoals Hook Farm’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5.9 | 1.5 km |
Solar Photovoltaics · Operational | — | 1.7 km |
Solar Photovoltaics · Operational | 31.3 | 1.7 km |
Solar Photovoltaics · Operational | 10.8 | 4.1 km |
Solar Photovoltaics · Operational | 6.1 | 4.5 km |
Landfill Gas · Operational | 2.4 | 5 km |
Solar Photovoltaics · Operational | 5 | 5.2 km |
Solar Photovoltaics · Operational | 5 | 5.4 km |
How big is Shoals Hook Farm?
Shoals Hook Farm has a recorded installed capacity of 12.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Shoals Hook Farm?
REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Shoals Hook Farm approved and built?
The application was submitted on 6 May 2014. Permission was granted on 3 October 2014, 5 months later. The site became operational on 31 March 2015, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2180.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode