Renewable sites › Rudbaxton Solar Park
Rudbaxton Solar Park
Rudbaxton Solar Park is an operational 10.8 MW solar farm in Pembrokeshire, generating since 8 March 2014. Planning permission was granted on 27 July 2012, 6 months after submission. Operator of record: Rudbaxton Solar Park Limited.
Planning and build timeline
| Application submitted | 2 February 2012 |
| Permission granted | 27 July 2012 6 months after submission |
| Operational | 8 March 2014 19 months after consent |
Screening a site of your own?
Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rudbaxton Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 2.4 | 0.8 km |
Solar Photovoltaics · Operational | — | 2.9 km |
Solar Photovoltaics · Operational | 5.9 | 3.4 km |
Solar Photovoltaics · Operational | 31.3 | 4.1 km |
Solar Photovoltaics · Operational | 12.1 | 4.1 km |
Solar Photovoltaics · Operational | 6.1 | 5.9 km |
Solar Photovoltaics · Operational | 4.9 | 7 km |
Solar Photovoltaics · Operational | 6 | 8.1 km |
How big is Rudbaxton Solar Park?
Rudbaxton Solar Park has a recorded installed capacity of 10.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rudbaxton Solar Park?
REPD records the operator as Rudbaxton Solar Park Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rudbaxton Solar Park approved and built?
The application was submitted on 2 February 2012. Permission was granted on 27 July 2012, 6 months later. The site became operational on 8 March 2014, 19 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1598.