Rudbaxton Solar Park is operational in Pembrokeshire with a recorded capacity of 10.8 MW, and has been generating since 2014-03-08.
Planning and build timeline
| Application submitted | 2012-02-02 |
| Permission granted | 2012-07-27 6 months after submission |
| Operational | 2014-03-08 19 months after consent |
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Withyhedge Generation Plant Landfill Gas · Operational | 2.4 | 0.8 km |
Puffin Produce - Solar Panels Solar Photovoltaics · Operational | — | 2.9 km |
Crundale / Fenton Home Farm (extension) Solar Photovoltaics · Operational | 5.9 | 3.4 km |
Fenton Home Farm Solar Photovoltaics · Operational | 31.3 | 4.1 km |
Shoals Hook Farm Solar Photovoltaics · Operational | 12.1 | 4.1 km |
Cuckoo Grove Farm Solar Photovoltaics · Operational | 6.1 | 5.9 km |
Oak Cottage Solar Photovoltaics · Operational | 4.9 | 7 km |
AMBLESTON SOLAR PANELS Solar Photovoltaics · Operational | 6 | 8.1 km |
How big is Rudbaxton Solar Park?
Rudbaxton Solar Park has a recorded installed capacity of 10.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rudbaxton Solar Park?
REPD records the operator as Rudbaxton Solar Park Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rudbaxton Solar Park approved and built?
The application was submitted on 2012-02-02. Permission was granted on 2012-07-27, 6 months later. The site became operational on 2014-03-08, 19 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1598.