Renewable sitesRudbaxton Solar Park

Rudbaxton Solar Park

Rudbaxton Solar Park is operational in Pembrokeshire with a recorded capacity of 10.8 MW, and has been generating since 2014-03-08.

10.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-08
Solar Photovoltaics
Technology
Rudbaxton Solar Park Limited
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2012-02-02
Permission granted2012-07-27
6 months after submission
Operational2014-03-08
19 months after consent

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Withyhedge Generation Plant
Landfill Gas · Operational
2.40.8 km
Puffin Produce - Solar Panels
Solar Photovoltaics · Operational
2.9 km
Crundale / Fenton Home Farm (extension)
Solar Photovoltaics · Operational
5.93.4 km
Fenton Home Farm
Solar Photovoltaics · Operational
31.34.1 km
Shoals Hook Farm
Solar Photovoltaics · Operational
12.14.1 km
Cuckoo Grove Farm
Solar Photovoltaics · Operational
6.15.9 km
Oak Cottage
Solar Photovoltaics · Operational
4.97 km
AMBLESTON SOLAR PANELS
Solar Photovoltaics · Operational
68.1 km

How big is Rudbaxton Solar Park?

Rudbaxton Solar Park has a recorded installed capacity of 10.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rudbaxton Solar Park?

REPD records the operator as Rudbaxton Solar Park Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rudbaxton Solar Park approved and built?

The application was submitted on 2012-02-02. Permission was granted on 2012-07-27, 6 months later. The site became operational on 2014-03-08, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1598.