Rudbaxton Solar Park

Rudbaxton Solar Park is an operational 10.8 MW solar farm in Pembrokeshire, generating since 8 March 2014. Planning permission was granted on 27 July 2012, 6 months after submission. Operator of record: Rudbaxton Solar Park Limited.

10.8 MW
Capacity
as recorded in REPD
Operational
Status
since 8 March 2014
Solar Photovoltaics
Technology
Rudbaxton Solar Park Limited
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2 February 2012
Permission granted27 July 2012
6 months after submission
Operational8 March 2014
19 months after consent

Screening a site of your own?

RedlineUK · £39

Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rudbaxton Solar Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.40.8 km
Solar Photovoltaics · Operational
2.9 km
Solar Photovoltaics · Operational
5.93.4 km
Solar Photovoltaics · Operational
31.34.1 km
Solar Photovoltaics · Operational
12.14.1 km
Solar Photovoltaics · Operational
6.15.9 km
Solar Photovoltaics · Operational
4.97 km
Solar Photovoltaics · Operational
68.1 km

How big is Rudbaxton Solar Park?

Rudbaxton Solar Park has a recorded installed capacity of 10.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rudbaxton Solar Park?

REPD records the operator as Rudbaxton Solar Park Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rudbaxton Solar Park approved and built?

The application was submitted on 2 February 2012. Permission was granted on 27 July 2012, 6 months later. The site became operational on 8 March 2014, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1598.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode