Renewable sites › Puffin Produce - Solar Panels
Puffin Produce - Solar Panels
Puffin Produce - Solar Panels is an operational solar farm in Pembrokeshire, generating since 12 July 2024. REPD does not record the planning grant date. Operator of record: Puffin Produce.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 12 July 2024 |
Screening a site of your own?
Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Puffin Produce - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 12.1 | 1.7 km |
Solar Photovoltaics · Operational | 5.9 | 2.1 km |
Solar Photovoltaics · Operational | 31.3 | 2.8 km |
Solar Photovoltaics · Operational | 10.8 | 2.9 km |
Solar Photovoltaics · Operational | 6.1 | 3.7 km |
Landfill Gas · Operational | 2.4 | 3.8 km |
Solar Photovoltaics · Operational | 5 | 5.6 km |
Solar Photovoltaics · Operational | 5 | 6 km |
How big is Puffin Produce - Solar Panels?
REPD does not record an installed capacity for Puffin Produce - Solar Panels.
Who operates Puffin Produce - Solar Panels?
REPD records the operator as Puffin Produce. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Puffin Produce - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 12 July 2024.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16760.