Renewable sitesCuckoo Grove Farm

Cuckoo Grove Farm

Cuckoo Grove Farm is an operational 6.1 MW solar farm in Pembrokeshire, generating since 26 March 2015. Planning permission was granted on 25 April 2013, 5 months after submission. Operator of record: Foresight.

6.1 MW
Capacity
as recorded in REPD
Operational
Status
since 26 March 2015
Solar Photovoltaics
Technology
Foresight
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted9 November 2012
Permission granted25 April 2013
5 months after submission
Operational26 March 2015
23 months after consent

Screening a site of your own?

RedlineUK · £39

Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cuckoo Grove Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
3.7 km
Solar Photovoltaics · Operational
53.9 km
Wind Onshore · Operational
1.64 km
Solar Photovoltaics · Operational
54.3 km
Solar Photovoltaics · Operational
12.14.5 km
Solar Photovoltaics · Operational
0.55.6 km
Solar Photovoltaics · Operational
5.95.7 km
Solar Photovoltaics · Operational
10.85.9 km

How big is Cuckoo Grove Farm?

Cuckoo Grove Farm has a recorded installed capacity of 6.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cuckoo Grove Farm?

REPD records the operator as Foresight. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cuckoo Grove Farm approved and built?

The application was submitted on 9 November 2012. Permission was granted on 25 April 2013, 5 months later. The site became operational on 26 March 2015, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2376.