Winchester Battery Storage is an operational 19 MW battery storage site in Winchester, generating since 1 May 2023. Planning permission was granted on 23 June 2017, 3 months after submission. Operator of record: Conrad Energy.

19 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2023
Battery
Technology
Conrad Energy
Winchester
Authority
England

Planning and build timeline

Application submitted7 April 2017
Permission granted23 June 2017
3 months after submission
Operational1 May 2023
70 months after consent

Screening a site of your own?

RedlineUK · £39

Winchester approves 89% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Winchester Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Winchester’s record on battery storage

Winchester has decided 9 battery storage schemes and approved 89%, taking a median of 5.1 months. See every battery storage scheme decision in Winchester

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
6.43.6 km
Solar Photovoltaics · Operational
258.6 km
Landfill Gas · Operational
1.510.1 km
Solar Photovoltaics · Operational
6.310.6 km
Solar Photovoltaics · Operational
511.1 km
Solar Photovoltaics · Operational
511.3 km
Solar Photovoltaics · Operational
1111.3 km
Landfill Gas · Operational
112.1 km

How big is Winchester Battery Storage?

Winchester Battery Storage has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Winchester Battery Storage?

REPD records the operator as Conrad Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Winchester Battery Storage approved and built?

The application was submitted on 7 April 2017. Permission was granted on 23 June 2017, 3 months later. The site became operational on 1 May 2023, 70 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20401.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode