Winchester Battery Storage

Winchester Battery Storage is operational in Winchester with a recorded capacity of 19 MW, and has been generating since 2023-05-01.

19 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-05-01
Battery
Technology
Conrad Energy
Winchester
Authority
England

Planning and build timeline

Application submitted2017-04-07
Permission granted2017-06-23
3 months after submission
Operational2023-05-01
70 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Winchester’s record on battery storage

Winchester has decided 9 battery storage schemes and approved 89%, taking a median of 5.1 months. See every battery storage scheme decision in Winchester

Other built sites within 15 km

SiteMWDistance
Field House Solar / Hursley Road
Solar Photovoltaics · Operational
6.43.6 km
Three Maids Hill Solar Farm
Solar Photovoltaics · Operational
258.6 km
Fairoak Landfill
Landfill Gas · Operational
1.510.1 km
Chalcroft Solar Park
Solar Photovoltaics · Operational
6.310.6 km
Highwood Lane
Solar Photovoltaics · Operational
511.1 km
Grove Solar Park (Phase 2)
Solar Photovoltaics · Operational
1111.3 km
Grove Solar Park (Phase 1)
Solar Photovoltaics · Operational
511.3 km
Squabb Wood
Landfill Gas · Operational
112.1 km

How big is Winchester Battery Storage?

Winchester Battery Storage has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Winchester Battery Storage?

REPD records the operator as Conrad Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Winchester Battery Storage approved and built?

The application was submitted on 2017-04-07. Permission was granted on 2017-06-23, 3 months later. The site became operational on 2023-05-01, 70 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20401.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council