Fairoak Landfill

Fairoak Landfill is operational in Eastleigh with a recorded capacity of 1.5 MW, and has been generating since 2006-04-24.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-04-24
Landfill Gas
Technology
Renewable Power Generation Ltd
Eastleigh
Authority
England

Planning and build timeline

Application submitted2005-04-19
Permission granted2005-09-13
5 months after submission
Operational2006-04-24
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Chalcroft Solar Park
Solar Photovoltaics · Operational
6.32.4 km
Bishop�s Waltham Solar Farm
Solar Photovoltaics · Operational
125.6 km
Forest Farm
Solar Photovoltaics · Operational
36 km
Raglington Farm
Solar Photovoltaics · Operational
5.86.1 km
Netley Landfill Solar
Solar Photovoltaics · Operational
128.8 km
Netley Landfill Site, Hampshire (Extension)
Landfill Gas · Operational
1.29.1 km
Field House Solar / Hursley Road
Solar Photovoltaics · Operational
6.49.2 km
Titchfield Lane
Battery · Under Construction
4910.1 km

How big is Fairoak Landfill?

Fairoak Landfill has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fairoak Landfill?

REPD records the operator as Renewable Power Generation Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fairoak Landfill approved and built?

The application was submitted on 2005-04-19. Permission was granted on 2005-09-13, 5 months later. The site became operational on 2006-04-24, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 750.