Novarly ParcelRenewable sites

Renewable sitesWilton International

Wilton International

Wilton International is an operational 35.2 MW biomass plant in Redcar and Cleveland, generating since 26 March 2007. Planning permission was granted on 7 November 2006, 2 months after submission. Operator of record: UK Wood Recycling.

35.2 MW
Capacity
as recorded in REPD
Operational
Status
since 26 March 2007
Biomass (dedicated)
Technology
UK Wood Recycling
Redcar and Cleveland
Authority
England

Planning and build timeline

Application submitted6 September 2006
Permission granted7 November 2006
2 months after submission
Operational26 March 2007
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Redcar and Cleveland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Wilton International’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
490 km
Solar Photovoltaics · Operational
53.8 km
Landfill Gas · Operational
14.7 km
Solar Photovoltaics · Under Construction
0.175.7 km
Anaerobic Digestion · Operational
5.15.9 km
Wind Offshore · Operational
628.7 km
Solar Photovoltaics · Operational
0.188.9 km
Biomass (dedicated) · Under Construction
409 km

How big is Wilton International?

Wilton International has a recorded installed capacity of 35.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wilton International?

REPD records the operator as UK Wood Recycling. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wilton International approved and built?

The application was submitted on 6 September 2006. Permission was granted on 7 November 2006, 2 months later. The site became operational on 26 March 2007, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 35.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode