Albert Road Rooftop Solar Panels

Albert Road Rooftop Solar Panels is operational in Middlesbrough with a recorded capacity of 0.18 MW, and has been generating since 2021-09-12.

0.18 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-09-12
Solar Photovoltaics
Technology
Ministry of Justice
Middlesbrough
Authority
England

Planning and build timeline

Application submitted2020-11-12
Permission granted2021-03-17
4 months after submission
Operational2021-09-12
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Middlesbrough’s record on solar

Middlesbrough has decided 8 solar farms and approved 100%, taking a median of 1.1 months. See every solar farm decision in Middlesbrough

Other built sites within 15 km

SiteMWDistance
Teesside Green Energy Plant (Waste AD)
Anaerobic Digestion · Operational
4.81.2 km
Port Clarence Biomass Plant
Biomass (dedicated) · Under Construction
401.6 km
Haverton Hill Incinerator
EfW Incineration · Operational
20.12.9 km
North East Energy Recovery Centre (adjacent to Teesside EfW)
EfW Incineration · Operational
213 km
Teesside EfW
EfW Incineration · Operational
19.23 km
Teesside EfW (extension)
EfW Incineration · Operational
103 km
Billingham Chemical Works
EfW Incineration · Operational
123.2 km
Imperial Park
Anaerobic Digestion · Operational
5.13.3 km

How big is Albert Road Rooftop Solar Panels?

Albert Road Rooftop Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Albert Road Rooftop Solar Panels?

REPD records the operator as Ministry of Justice. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Albert Road Rooftop Solar Panels approved and built?

The application was submitted on 2020-11-12. Permission was granted on 2021-03-17, 4 months later. The site became operational on 2021-09-12, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8204.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council