Novarly ParcelRenewable sites

Renewable sitesWilton 11 EfW

Wilton 11 EfW

Wilton 11 EfW is operational in Redcar and Cleveland with a recorded capacity of 49 MW, and has been generating since 2017-04-04.

49 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-04
EfW Incineration
Technology
SUEZ / Sembcorp UK
Redcar and Cleveland
Authority
England

Planning and build timeline

Application submitted2010-08-11
Permission granted2010-10-06
2 months after submission
Operational2017-04-04
78 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wilton International
Biomass (dedicated) · Operational
35.20 km
Land at Woodhouse Farm
Solar Photovoltaics · Operational
53.8 km
ICI No2 (Teesport) Landfill
Landfill Gas · Operational
14.7 km
Kirkleatham Street - Solar Panel Array
Solar Photovoltaics · Under Construction
0.175.7 km
Imperial Park
Anaerobic Digestion · Operational
5.15.9 km
Teeside Offshore Wind Farm
Wind Offshore · Operational
628.7 km
Albert Road Rooftop Solar Panels
Solar Photovoltaics · Operational
0.188.9 km
Port Clarence Biomass Plant
Biomass (dedicated) · Under Construction
409 km

How big is Wilton 11 EfW?

Wilton 11 EfW has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wilton 11 EfW?

REPD records the operator as SUEZ / Sembcorp UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wilton 11 EfW approved and built?

The application was submitted on 2010-08-11. Permission was granted on 2010-10-06, 2 months later. The site became operational on 2017-04-04, 78 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 930.