Wilton 11 EfW
Wilton 11 EfW is an operational 49 MW energy-from-waste plant in Redcar and Cleveland, generating since 4 April 2017. Planning permission was granted on 6 October 2010, 2 months after submission. Operator of record: SUEZ / Sembcorp UK.
Planning and build timeline
| Application submitted | 11 August 2010 |
| Permission granted | 6 October 2010 2 months after submission |
| Operational | 4 April 2017 78 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Redcar and Cleveland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Wilton 11 EfW’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Ancient woodland — WILTON WOOD\+
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 35.2 | 0 km |
Solar Photovoltaics · Operational | 5 | 3.8 km |
Landfill Gas · Operational | 1 | 4.7 km |
Solar Photovoltaics · Under Construction | 0.17 | 5.7 km |
Anaerobic Digestion · Operational | 5.1 | 5.9 km |
Wind Offshore · Operational | 62 | 8.7 km |
Solar Photovoltaics · Operational | 0.18 | 8.9 km |
Biomass (dedicated) · Under Construction | 40 | 9 km |
How big is Wilton 11 EfW?
Wilton 11 EfW has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wilton 11 EfW?
REPD records the operator as SUEZ / Sembcorp UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wilton 11 EfW approved and built?
The application was submitted on 11 August 2010. Permission was granted on 6 October 2010, 2 months later. The site became operational on 4 April 2017, 78 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 930.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode