Kirkleatham Street - Solar Panel Array is under construction in Redcar and Cleveland with a recorded capacity of 0.17 MW.

0.17 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Advanced Renewable Power Limited
Redcar and Cleveland
Authority
England

Planning and build timeline

Application submitted2022-01-14
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Redcar and Cleveland’s record on solar

Redcar and Cleveland has decided 10 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Redcar and Cleveland

Other built sites within 15 km

SiteMWDistance
Teeside Offshore Wind Farm
Wind Offshore · Operational
623.6 km
Wilton 11 EfW
EfW Incineration · Operational
495.7 km
Wilton International
Biomass (dedicated) · Operational
35.25.7 km
ICI No2 (Teesport) Landfill
Landfill Gas · Operational
16.1 km
Imperial Park
Anaerobic Digestion · Operational
5.18.2 km
Land at Woodhouse Farm
Solar Photovoltaics · Operational
59.1 km
Dean Group Business Park - Hartlepool
Anaerobic Digestion · Operational
5.19.3 km
Port Clarence Biomass Plant
Biomass (dedicated) · Under Construction
4010.7 km

How big is Kirkleatham Street - Solar Panel Array?

Kirkleatham Street - Solar Panel Array has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkleatham Street - Solar Panel Array?

REPD records the operator as Advanced Renewable Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkleatham Street - Solar Panel Array approved and built?

The application was submitted on 2022-01-14. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10471.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council