Renewable sites › Kirkleatham Street - Solar Panel Array
Kirkleatham Street - Solar Panel Array
Kirkleatham Street - Solar Panel Array is a 0.17 MW solar farm under construction in Redcar and Cleveland. REPD does not record the planning grant date. Operator of record: Advanced Renewable Power Limited.
Planning and build timeline
| Application submitted | 14 January 2022 |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Redcar and Cleveland approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Kirkleatham Street - Solar Panel Array’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Redcar and Cleveland’s record on solar
Redcar and Cleveland has decided 10 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Redcar and Cleveland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Offshore · Operational | 62 | 3.6 km |
Biomass (dedicated) · Operational | 35.2 | 5.7 km |
EfW Incineration · Operational | 49 | 5.7 km |
Landfill Gas · Operational | 1 | 6.1 km |
Anaerobic Digestion · Operational | 5.1 | 8.2 km |
Solar Photovoltaics · Operational | 5 | 9.1 km |
Anaerobic Digestion · Operational | 5.1 | 9.3 km |
Biomass (dedicated) · Under Construction | 40 | 10.7 km |
How big is Kirkleatham Street - Solar Panel Array?
Kirkleatham Street - Solar Panel Array has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kirkleatham Street - Solar Panel Array?
REPD records the operator as Advanced Renewable Power Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kirkleatham Street - Solar Panel Array approved and built?
The application was submitted on 14 January 2022. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10471.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode