Novarly ParcelRenewable sites

Renewable sitesWidnes 3MG Biomass/Mersey Bioenergy (CHP) Plant

Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant

Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant is operational in Halton with a recorded capacity of 20 MW, and has been generating since 2017-02-06.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-06
Biomass (dedicated)
Technology
Burmeister & Wain Scandinavian (BWSC)/ Bioenergy Infrastructure Group
Halton
Authority
England

Planning and build timeline

Application submitted2012-10-22
Permission granted2013-04-04
5 months after submission
Operational2017-02-06
46 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Granox Biogas Plant
Anaerobic Digestion · Operational
50.4 km
Leiria Way Car Park
Battery · Operational
2 km
Runcorn EfW
EfW Incineration · Operational
1003.2 km
Fiddlers Ferry Power Station - Battery storage
Battery · Under Construction
1504.7 km
Frodsham Marsh
Wind Onshore · Operational
50.46.1 km
Arpley Landfill Scheme 'B'
Landfill Gas · Operational
7.97.4 km
Arpley Landfill Scheme 'A'
Landfill Gas · Operational
7.97.4 km
Daresbury Science Park - Solar Array
Solar Photovoltaics · Operational
0.567.5 km

How big is Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant?

Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant?

REPD records the operator as Burmeister & Wain Scandinavian (BWSC)/ Bioenergy Infrastructure Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Widnes 3MG Biomass/Mersey Bioenergy (CHP) Plant approved and built?

The application was submitted on 2012-10-22. Permission was granted on 2013-04-04, 5 months later. The site became operational on 2017-02-06, 46 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 190.