Fiddlers Ferry Power Station - Battery storage

Fiddlers Ferry Power Station - Battery storage is a 150 MW battery storage site under construction in Warrington. Planning permission was granted on 20 June 2023, 11 months after submission. Operator of record: SSE Enterprise (SSE PLC).

150 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
SSE Enterprise (SSE PLC)
Warrington
Authority
England

Planning and build timeline

Application submitted27 July 2022
Permission granted20 June 2023
11 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Warrington: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fiddlers Ferry Power Station - Battery storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
7.93 km
Landfill Gas · Operational
7.93 km
Solar Photovoltaics · Operational
1.54.2 km
Solar Photovoltaics · Operational
0.564.5 km
Battery · Operational
4.5 km
Anaerobic Digestion · Operational
54.5 km
Biomass (dedicated) · Operational
204.7 km
Solar Photovoltaics · Under Construction
15.7 km

How big is Fiddlers Ferry Power Station - Battery storage?

Fiddlers Ferry Power Station - Battery storage has a recorded installed capacity of 150 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fiddlers Ferry Power Station - Battery storage?

REPD records the operator as SSE Enterprise (SSE PLC). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fiddlers Ferry Power Station - Battery storage approved and built?

The application was submitted on 27 July 2022. Permission was granted on 20 June 2023, 11 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9404.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode