Arpley Landfill Scheme 'B'
Arpley Landfill Scheme 'B' is operational in Warrington with a recorded capacity of 7.9 MW, and has been generating since 1999-12-10.
Planning and build timeline
| Application submitted | 1999-04-15 |
| Permission granted | 1999-07-14 3 months after submission |
| Operational | 1999-12-10 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Warrington
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Arpley Landfill Scheme 'A' Landfill Gas · Operational | 7.9 | 0 km |
Former St Michaels Golf Course Solar Photovoltaics · Under Construction | 1 | 2.9 km |
Daresbury Science Park - Solar Array Solar Photovoltaics · Operational | 0.56 | 3 km |
Fiddlers Ferry Power Station - Battery storage Battery · Under Construction | 150 | 3 km |
Warrington Home Solar Scheme Solar Photovoltaics · Operational | 5.3 | 3.2 km |
Amazon Omega Business Park Solar Photovoltaics · Operational | 1.5 | 4 km |
Leiria Way Car Park Battery · Operational | — | 6.7 km |
Granox Biogas Plant Anaerobic Digestion · Operational | 5 | 7.2 km |
How big is Arpley Landfill Scheme 'B'?
Arpley Landfill Scheme 'B' has a recorded installed capacity of 7.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Arpley Landfill Scheme 'B'?
REPD records the operator as NOVERA. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Arpley Landfill Scheme 'B' approved and built?
The application was submitted on 1999-04-15. Permission was granted on 1999-07-14, 3 months later. The site became operational on 1999-12-10, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 549.