Frodsham Marsh is an operational 50.4 MW onshore wind farm in Cheshire West and Chester, generating since 15 November 2016. Planning permission was granted on 19 October 2012, 32 months after submission. Operator of record: Foresight/Belltown.

50.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 November 2016
Wind Onshore
Technology
Foresight/Belltown
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted25 February 2010
Permission granted19 October 2012
32 months after submission
Operational15 November 2016
49 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Cheshire West and Chester: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Frodsham Marsh’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
1003 km
Advanced Conversion Technologies · Operational
21.53.9 km
EfW Incineration · Under Construction
354.3 km
Battery · Operational
5.2 km
Anaerobic Digestion · Operational
56 km
Biomass (dedicated) · Operational
206.1 km
Landfill Gas · Operational
1.68.2 km
Landfill Gas · Operational
68.2 km

How big is Frodsham Marsh?

Frodsham Marsh has a recorded installed capacity of 50.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Frodsham Marsh?

REPD records the operator as Foresight/Belltown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Frodsham Marsh approved and built?

The application was submitted on 25 February 2010. Permission was granted on 19 October 2012, 32 months later. The site became operational on 15 November 2016, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3694.