Leiria Way Car Park

Leiria Way Car Park is an operational battery storage site in Halton, generating since 1 May 2021. Planning permission was granted on 5 May 2020, 3 months after submission. Operator of record: Entrust Microgrid.

Capacity
as recorded in REPD
Operational
Status
since 1 May 2021
Battery
Technology
Entrust Microgrid
Halton
Authority
England

Planning and build timeline

Application submitted18 February 2020
Permission granted5 May 2020
3 months after submission
Operational1 May 2021
12 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Halton: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Leiria Way Car Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
51.6 km
Biomass (dedicated) · Operational
202 km
EfW Incineration · Operational
1002.3 km
Battery · Under Construction
1504.5 km
Wind Onshore · Operational
50.45.2 km
Solar Photovoltaics · Operational
0.566.1 km
Landfill Gas · Operational
7.96.7 km
Landfill Gas · Operational
7.96.7 km

How big is Leiria Way Car Park?

REPD does not record an installed capacity for Leiria Way Car Park.

Who operates Leiria Way Car Park?

REPD records the operator as Entrust Microgrid. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Leiria Way Car Park approved and built?

The application was submitted on 18 February 2020. Permission was granted on 5 May 2020, 3 months later. The site became operational on 1 May 2021, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7776.