Wick Farm Melksham Substation is under construction in Wiltshire with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
JBM Solar Projects
Wiltshire
Authority
England

Planning and build timeline

Application submitted2020-08-19
Permission granted2021-12-17
16 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Wick Farm, Melksham Substation
Battery · Under Construction
0 km
Melksham Substation East Storage
Battery · Operational
501.3 km
Roundponds Farm Solar Park
Solar Photovoltaics · Operational
13.53.4 km
Norrington Common Solar Farm
Solar Photovoltaics · Operational
103.4 km
Snarlton Farm (Melksham solar farm)
Solar Photovoltaics · Operational
49.65 km
Manor Farm (Wiltshire)
Solar Photovoltaics · Operational
6.35.6 km
CRAYSMARSH SOLAR FARM
Solar Photovoltaics · Operational
1.85.7 km
Bromham House Farm
Anaerobic Digestion · Operational
1.57.2 km

How big is Wick Farm Melksham Substation?

Wick Farm Melksham Substation has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wick Farm Melksham Substation?

REPD records the operator as JBM Solar Projects. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wick Farm Melksham Substation approved and built?

The application was submitted on 2020-08-19. Permission was granted on 2021-12-17, 16 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8062.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council