Novarly ParcelRenewable sites

Renewable sitesRoundponds Farm Solar Park

Roundponds Farm Solar Park

Roundponds Farm Solar Park is operational in Wiltshire with a recorded capacity of 13.5 MW, and has been generating since 2015-03-31.

13.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Hive Energy
Wiltshire
Authority
England

Planning and build timeline

Application submitted2014-01-09
Permission granted2014-05-23
4 months after submission
Operational2015-03-31
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Norrington Common Solar Farm
Solar Photovoltaics · Operational
100.6 km
Melksham Substation East Storage
Battery · Operational
502.2 km
Wick Farm, Melksham Substation
Battery · Under Construction
3.4 km
Wick Farm Melksham Substation
Solar Photovoltaics · Under Construction
49.93.4 km
Marsh Farm Hilperton
Solar Photovoltaics · Operational
9.14.5 km
Manor Farm (Wiltshire)
Solar Photovoltaics · Operational
6.35.1 km
CRAYSMARSH SOLAR FARM
Solar Photovoltaics · Operational
1.85.1 km
Snarlton Farm (Melksham solar farm)
Solar Photovoltaics · Operational
49.65.1 km

How big is Roundponds Farm Solar Park?

Roundponds Farm Solar Park has a recorded installed capacity of 13.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roundponds Farm Solar Park?

REPD records the operator as Hive Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roundponds Farm Solar Park approved and built?

The application was submitted on 2014-01-09. Permission was granted on 2014-05-23, 4 months later. The site became operational on 2015-03-31, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2023.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council