Melksham Substation East Storage

Melksham Substation East Storage is an operational 50 MW battery storage site in Wiltshire, generating since 7 November 2022. Planning permission was granted on 26 April 2019, 24 months after submission. Operator of record: Statera Energy / Melksham East Storage.

50 MW
Capacity
as recorded in REPD
Operational
Status
since 7 November 2022
Battery
Technology
Statera Energy / Melksham East Storage
Wiltshire
Authority
England

Planning and build timeline

Application submitted10 May 2017
Permission granted26 April 2019
24 months after submission
Operational7 November 2022
42 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 97% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Melksham Substation East Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on battery storage

Wiltshire has decided 30 battery storage schemes and approved 97%, taking a median of 13.9 months. See every battery storage scheme decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.91.3 km
Battery · Under Construction
1.3 km
Solar Photovoltaics · Operational
102.1 km
Solar Photovoltaics · Operational
13.52.2 km
Solar Photovoltaics · Operational
6.34.7 km
Solar Photovoltaics · Operational
49.65.3 km
Solar Photovoltaics · Operational
1.85.8 km
Solar Photovoltaics · Operational
9.16.7 km

How big is Melksham Substation East Storage?

Melksham Substation East Storage has a recorded installed capacity of 50 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Melksham Substation East Storage?

REPD records the operator as Statera Energy / Melksham East Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Melksham Substation East Storage approved and built?

The application was submitted on 10 May 2017. Permission was granted on 26 April 2019, 24 months later. The site became operational on 7 November 2022, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6953.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode