Norrington Common Solar Farm

Norrington Common Solar Farm is an operational 10 MW solar farm in Wiltshire, generating since 4 July 2014. Planning permission was granted on 25 April 2013, 5 months after submission. Operator of record: Terraform Power (SunEdison).

10 MW
Capacity
as recorded in REPD
Operational
Status
since 4 July 2014
Solar Photovoltaics
Technology
Terraform Power (SunEdison)
Wiltshire
Authority
England

Planning and build timeline

Application submitted22 November 2012
Permission granted25 April 2013
5 months after submission
Operational4 July 2014
14 months after consent

Screening a site of your own?

RedlineUK · £39

Wiltshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Norrington Common Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
13.50.6 km
Battery · Operational
502.1 km
Solar Photovoltaics · Under Construction
49.93.4 km
Battery · Under Construction
3.4 km
Solar Photovoltaics · Operational
6.34.5 km
Solar Photovoltaics · Operational
9.14.7 km
Solar Photovoltaics · Operational
49.65.7 km
Solar Photovoltaics · Operational
1.85.7 km

How big is Norrington Common Solar Farm?

Norrington Common Solar Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Norrington Common Solar Farm?

REPD records the operator as Terraform Power (SunEdison). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Norrington Common Solar Farm approved and built?

The application was submitted on 22 November 2012. Permission was granted on 25 April 2013, 5 months later. The site became operational on 4 July 2014, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2285.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode