Novarly ParcelRenewable sites

Renewable sitesWhittlesey

Whittlesey

Whittlesey is operational in Fenland with a recorded capacity of 9 MW, and has been generating since 2008-09-03.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-09-03
Wind Onshore
Technology
REG Windpower (previously Cornwall Light and Power)
Fenland
Authority
England

Planning and build timeline

Application submitted2007-04-13
Permission granted2007-07-09
3 months after submission
Operational2008-09-03
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on onshore wind

Fenland has decided 20 onshore wind schemes and approved 85%, taking a median of 12.8 months. See every onshore wind scheme decision in Fenland

Other built sites within 15 km

SiteMWDistance
McCain Foods AD Plant (AD)
Anaerobic Digestion · Operational
10.3 km
Black Bush Farm
Solar Photovoltaics · Operational
2.71.9 km
Peterborough EfW
EfW Incineration · Operational
7.33 km
Dogsthorpe South Landfill Site
Landfill Gas · Operational
1.95.9 km
Dogsthorpe South Landfill Site 2
Landfill Gas · Operational
1.45.9 km
Glass moor Extension
Wind Onshore · Operational
126.1 km
Glass Moor
Wind Onshore · Operational
166.1 km
Burnt House Farm
Wind Onshore · Operational
69.7 km

How big is Whittlesey?

Whittlesey has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whittlesey?

REPD records the operator as REG Windpower (previously Cornwall Light and Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whittlesey approved and built?

The application was submitted on 2007-04-13. Permission was granted on 2007-07-09, 3 months later. The site became operational on 2008-09-03, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3021.

Novarly Parcel · official public data, read properly · parcel.novarly.com