Renewable sitesMcCain Foods AD Plant (AD)

McCain Foods AD Plant (AD)

McCain Foods AD Plant (AD) is operational in Fenland with a recorded capacity of 1 MW, and has been generating since 2010-05-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-05-01
Anaerobic Digestion
Technology
McCain Foods
Fenland
Authority
England

Planning and build timeline

Application submitted2008-03-12
Permission granted2008-04-09
1 months after submission
Operational2010-05-01
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Whittlesey
Wind Onshore · Operational
90.3 km
Black Bush Farm
Solar Photovoltaics · Operational
2.72.1 km
Peterborough EfW
EfW Incineration · Operational
7.32.7 km
Dogsthorpe South Landfill Site
Landfill Gas · Operational
1.95.7 km
Dogsthorpe South Landfill Site 2
Landfill Gas · Operational
1.45.7 km
Glass Moor
Wind Onshore · Operational
166.4 km
Glass moor Extension
Wind Onshore · Operational
126.4 km
Burnt House Farm
Wind Onshore · Operational
69.9 km

How big is McCain Foods AD Plant (AD)?

McCain Foods AD Plant (AD) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates McCain Foods AD Plant (AD)?

REPD records the operator as McCain Foods. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was McCain Foods AD Plant (AD) approved and built?

The application was submitted on 2008-03-12. Permission was granted on 2008-04-09, 1 months later. The site became operational on 2010-05-01, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 278.