Peterborough EfW is an operational 7.3 MW energy-from-waste plant in Peterborough, generating since 19 January 2016. Planning permission was granted on 6 May 2010, 15 months after submission. Operator of record: Viridor.

7.3 MW
Capacity
as recorded in REPD
Operational
Status
since 19 January 2016
EfW Incineration
Technology
Viridor
Peterborough
Authority
England

Planning and build timeline

Application submitted15 February 2009
Permission granted6 May 2010
15 months after submission
Operational19 January 2016
68 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Peterborough: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Peterborough EfW’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
12.7 km
Wind Onshore · Operational
93 km
Landfill Gas · Operational
1.93.1 km
Landfill Gas · Operational
1.43.1 km
Solar Photovoltaics · Operational
2.74.9 km
Wind Onshore · Operational
129.1 km
Wind Onshore · Operational
169.1 km
Wind Onshore · Operational
412 km

How big is Peterborough EfW?

Peterborough EfW has a recorded installed capacity of 7.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Peterborough EfW?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Peterborough EfW approved and built?

The application was submitted on 15 February 2009. Permission was granted on 6 May 2010, 15 months later. The site became operational on 19 January 2016, 68 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 905.