Glass moor Extension

Glass moor Extension is an operational 12 MW onshore wind farm in Fenland, generating since 31 March 2013. Planning permission was granted on 10 April 2012, 14 months after submission. Operator of record: EDF/China General Nuclear Power Corporation.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2013
Wind Onshore
Technology
EDF/China General Nuclear Power Corporation
Fenland
Authority
England

Planning and build timeline

Application submitted31 January 2011
Permission granted10 April 2012
14 months after submission
Operational31 March 2013
12 months after consent

Screening a site of your own?

RedlineUK · £39

Fenland approves 85% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glass moor Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on onshore wind

Fenland has decided 20 onshore wind schemes and approved 85%, taking a median of 12.8 months. See every onshore wind scheme decision in Fenland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
160 km
Solar Photovoltaics · Operational
2.74.4 km
Wind Onshore · Operational
65.5 km
Wind Onshore · Operational
85.7 km
Solar Photovoltaics · Operational
4.75.7 km
Solar Photovoltaics · Operational
55.8 km
Wind Onshore · Operational
96.1 km
Anaerobic Digestion · Operational
16.4 km

How big is Glass moor Extension?

Glass moor Extension has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glass moor Extension?

REPD records the operator as EDF/China General Nuclear Power Corporation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glass moor Extension approved and built?

The application was submitted on 31 January 2011. Permission was granted on 10 April 2012, 14 months later. The site became operational on 31 March 2013, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3765.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode