Whitelee Windfarm Extension Phase 1

Whitelee Windfarm Extension Phase 1 is operational in Scotland with a recorded capacity of 108 MW, and has been generating since 2012-10-31.

108 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-10-31
Wind Onshore
Technology
Scottish Power Renewables
National
Authority
Scotland

Planning and build timeline

Application submitted2008-04-01
Permission granted2009-05-20
14 months after submission
Operational2012-10-31
41 months after consent

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Whitelee
Wind Onshore · Operational
3220.7 km
National Wind Turbine Test Site
Wind Onshore · Operational
4.71.5 km
Myres Hill
Wind Onshore · Operational
1.81.7 km
Ardoch and Over Enoch Wind Farm (Over Enoch)
Wind Onshore · Operational
4.34.3 km
Whitelee Windfarm Extension phase 2
Wind Onshore · Operational
1094.6 km
Ardoch and Over Enoch Wind Farm (Ardoch)
Wind Onshore · Operational
7.25.2 km
West Browncastle
Wind Onshore · Operational
305.3 km
Calder Water Community Wind Farm
Wind Onshore · Operational
286.5 km

How big is Whitelee Windfarm Extension Phase 1?

Whitelee Windfarm Extension Phase 1 has a recorded installed capacity of 108 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whitelee Windfarm Extension Phase 1?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whitelee Windfarm Extension Phase 1 approved and built?

The application was submitted on 2008-04-01. Permission was granted on 2009-05-20, 14 months later. The site became operational on 2012-10-31, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3981.