Novarly ParcelRenewable sites

Renewable sitesWhitelee Windfarm Extension Phase 1

Whitelee Windfarm Extension Phase 1

Whitelee Windfarm Extension Phase 1 is an operational 108 MW onshore wind farm in Scotland, generating since 31 October 2012. Planning permission was granted on 20 May 2009, 14 months after submission. Operator of record: Scottish Power Renewables.

108 MW
Capacity
as recorded in REPD
Operational
Status
since 31 October 2012
Wind Onshore
Technology
Scottish Power Renewables
National
Authority
Scotland

Planning and build timeline

Application submitted1 April 2008
Permission granted20 May 2009
14 months after submission
Operational31 October 2012
41 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Whitelee Windfarm Extension Phase 1’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
3220.7 km
Wind Onshore · Operational
4.71.5 km
Wind Onshore · Operational
1.81.7 km
Wind Onshore · Operational
4.34.3 km
Wind Onshore · Operational
1094.6 km
Wind Onshore · Operational
7.25.2 km
Wind Onshore · Operational
305.3 km
Wind Onshore · Operational
286.5 km

How big is Whitelee Windfarm Extension Phase 1?

Whitelee Windfarm Extension Phase 1 has a recorded installed capacity of 108 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whitelee Windfarm Extension Phase 1?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whitelee Windfarm Extension Phase 1 approved and built?

The application was submitted on 1 April 2008. Permission was granted on 20 May 2009, 14 months later. The site became operational on 31 October 2012, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3981.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode