Ardoch and Over Enoch Wind Farm (Over Enoch)

Ardoch and Over Enoch Wind Farm (Over Enoch) is operational in East Renfrewshire with a recorded capacity of 4.3 MW, and has been generating since 2014-11-12.

4.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-11-12
Wind Onshore
Technology
2020 Renewables/ NTR
East Renfrewshire
Authority
Scotland

Planning and build timeline

Application submitted2011-09-27
Permission granted2012-04-13
7 months after submission
Operational2014-11-12
31 months after consent

East Renfrewshire’s record on onshore wind

East Renfrewshire has decided 10 onshore wind schemes and approved 80%, taking a median of 19.6 months. See every onshore wind scheme decision in East Renfrewshire

Other built sites within 15 km

SiteMWDistance
Ardoch and Over Enoch Wind Farm (Ardoch)
Wind Onshore · Operational
7.21.1 km
Myres Hill
Wind Onshore · Operational
1.82.6 km
National Wind Turbine Test Site
Wind Onshore · Operational
4.73 km
Whitelee
Wind Onshore · Operational
3223.6 km
Whitelee Windfarm Extension Phase 1
Wind Onshore · Operational
1084.3 km
Whitelee Wind Farm Battery Storage Extension
Battery · Operational
505.3 km
West Browncastle
Wind Onshore · Operational
306.3 km
Tennant Avenue College, East Kilbride - Solar Panels
Solar Photovoltaics · Under Construction
0.946.5 km

How big is Ardoch and Over Enoch Wind Farm (Over Enoch)?

Ardoch and Over Enoch Wind Farm (Over Enoch) has a recorded installed capacity of 4.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ardoch and Over Enoch Wind Farm (Over Enoch)?

REPD records the operator as 2020 Renewables/ NTR. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ardoch and Over Enoch Wind Farm (Over Enoch) approved and built?

The application was submitted on 2011-09-27. Permission was granted on 2012-04-13, 7 months later. The site became operational on 2014-11-12, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3855.