West of Rhiwfelin Fach Farm

West of Rhiwfelin Fach Farm is an operational 1.5 MW onshore wind farm in Rhondda Cynon Taf, generating since 31 August 2018. Planning permission was granted on 19 July 2016, 5 months after submission. Operator of record: Infinite Renewables.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 31 August 2018
Wind Onshore
Technology
Infinite Renewables
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted8 February 2016
Permission granted19 July 2016
5 months after submission
Operational31 August 2018
25 months after consent

Screening a site of your own?

RedlineUK · £39

Rhondda Cynon Taf approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with West of Rhiwfelin Fach Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Rhondda Cynon Taf’s record on onshore wind

Rhondda Cynon Taf has decided 13 onshore wind schemes and approved 92%, taking a median of 23.1 months. See every onshore wind scheme decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Battery · Operational
200.4 km
Solar Photovoltaics · Under Construction
62.1 km
Wind Onshore · Operational
2.52.4 km
Wind Onshore · Operational
124 km
Solar Photovoltaics · Operational
44.6 km
Wind Onshore · Operational
9.44.7 km
Solar Photovoltaics · Under Construction
1.34.9 km
Solar Photovoltaics · Operational
54.9 km

How big is West of Rhiwfelin Fach Farm?

West of Rhiwfelin Fach Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West of Rhiwfelin Fach Farm?

REPD records the operator as Infinite Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West of Rhiwfelin Fach Farm approved and built?

The application was submitted on 8 February 2016. Permission was granted on 19 July 2016, 5 months later. The site became operational on 31 August 2018, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6079.