Renewable sites › West Farm, Cosheston - Solar Farm
West Farm, Cosheston - Solar Farm
West Farm, Cosheston - Solar Farm is under construction in Pembrokeshire with a recorded capacity of 9 MW.
Planning and build timeline
| Application submitted | 2023-12-12 |
| Permission granted | 2024-03-28 4 months after submission |
| Operational | not recorded |
Pembrokeshire’s record on solar
Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
West Farm (Solar) Solar Photovoltaics · Operational | 7.7 | 0.3 km |
Golden Hill Solar Photovoltaics · Operational | 6.2 | 1.5 km |
Dragon Energy Park - Wind Farm Wind Onshore · Under Construction | 14.4 | 6.4 km |
Wear Point Wind Onshore · Operational | 8.2 | 6.8 km |
Chapel Hill Solar Photovoltaics · Operational | 8 | 7 km |
Dragon Long Meadow - Solar farm Solar Photovoltaics · Operational | 9.9 | 7.3 km |
Jordanston Solar Farm Solar Photovoltaics · Operational | 5 | 7.5 km |
Castle Pill - Repowering Wind Onshore · Operational | 3.2 | 8.3 km |
How big is West Farm, Cosheston - Solar Farm?
West Farm, Cosheston - Solar Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates West Farm, Cosheston - Solar Farm?
REPD records the operator as One Planet Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was West Farm, Cosheston - Solar Farm approved and built?
The application was submitted on 2023-12-12. Permission was granted on 2024-03-28, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15617.