Wedgehill Farm is operational in Dorset with a recorded capacity of 13 MW, and has been generating since 2015-01-30.

13 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-01-30
Solar Photovoltaics
Technology
Orta Solar
Dorset
Authority
England

Planning and build timeline

Application submitted2013-07-22
Permission granted2014-01-17
6 months after submission
Operational2015-01-30
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Verwood Solar Farm
Solar Photovoltaics · Operational
20.41.3 km
Mannington Battery Energy Storage System
Battery · Under Construction
49.91.4 km
Homeland Solar Farm
Solar Photovoltaics · Operational
13.23 km
Bedborough Farm
Solar Photovoltaics · Operational
75.2 km
Cross Roads Plantation
Solar Photovoltaics · Operational
56.6 km
Land Adj Harmer Warren Quarry
Battery · Under Construction
106.8 km
Chapel Lane Parley Solar Farm Phase 3
Solar Photovoltaics · Operational
47 km
Hamer Warren Solar Farm
Solar Photovoltaics · Under Construction
237.1 km

How big is Wedgehill Farm?

Wedgehill Farm has a recorded installed capacity of 13 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wedgehill Farm?

REPD records the operator as Orta Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wedgehill Farm approved and built?

The application was submitted on 2013-07-22. Permission was granted on 2014-01-17, 6 months later. The site became operational on 2015-01-30, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2086.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council