Renewable sites › Mannington Battery Energy Storage System
Mannington Battery Energy Storage System
Mannington Battery Energy Storage System is under construction in Dorset with a recorded capacity of 49.9 MW.
Planning and build timeline
| Application submitted | 2021-01-22 |
| Permission granted | 2021-07-02 5 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
- Green Belt — Dorset
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Dorset’s record on battery storage
Dorset has decided 15 battery storage schemes and approved 87%, taking a median of 7 months. See every battery storage scheme decision in Dorset →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wedgehill Farm Solar Photovoltaics · Operational | 13 | 1.4 km |
Verwood Solar Farm Solar Photovoltaics · Operational | 20.4 | 2.3 km |
Homeland Solar Farm Solar Photovoltaics · Operational | 13.2 | 2.6 km |
Bedborough Farm Solar Photovoltaics · Operational | 7 | 3.8 km |
Chapel Lane Parley Solar Farm Phase 3 Solar Photovoltaics · Operational | 4 | 5.7 km |
Chapel Lane Parley Solar Farm Phase 2 Solar Photovoltaics · Operational | 36 | 6.7 km |
Chapel Lane Parley Solar Farm Phase 1 Solar Photovoltaics · Operational | 20 | 6.9 km |
Chapel Lane ERF EfW Incineration · Under Construction | 3.4 | 7.4 km |
How big is Mannington Battery Energy Storage System?
Mannington Battery Energy Storage System has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mannington Battery Energy Storage System?
REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mannington Battery Energy Storage System approved and built?
The application was submitted on 2021-01-22. Permission was granted on 2021-07-02, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8833.