Renewable sites › Land Adj Harmer Warren Quarry
Land Adj Harmer Warren Quarry
Land Adj Harmer Warren Quarry is under construction in New Forest with a recorded capacity of 10 MW.
Planning and build timeline
| Application submitted | 2017-11-30 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — River Avon SAC
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
New Forest’s record on battery storage
New Forest has decided 5 battery storage schemes and approved 80%, taking a median of 4.3 months. See every battery storage scheme decision in New Forest →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hamer Warren Solar Farm Solar Photovoltaics · Under Construction | 23 | 0.4 km |
Cross Roads Plantation Solar Photovoltaics · Operational | 5 | 3 km |
Verwood Solar Farm Solar Photovoltaics · Operational | 20.4 | 5.5 km |
Homeland Solar Farm Solar Photovoltaics · Operational | 13.2 | 5.8 km |
Wedgehill Farm Solar Photovoltaics · Operational | 13 | 6.8 km |
Mannington Battery Energy Storage System Battery · Under Construction | 49.9 | 7.6 km |
Chapel Lane Parley Solar Farm Phase 3 Solar Photovoltaics · Operational | 4 | 10 km |
Chapel Lane Parley Solar Farm Phase 2 Solar Photovoltaics · Operational | 36 | 10.6 km |
How big is Land Adj Harmer Warren Quarry?
Land Adj Harmer Warren Quarry has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land Adj Harmer Warren Quarry?
REPD records the operator as New Forest Energy (formerly Somerley Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land Adj Harmer Warren Quarry approved and built?
The application was submitted on 2017-11-30. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7143.