Land Adj Harmer Warren Quarry

Land Adj Harmer Warren Quarry is a 10 MW battery storage site under construction in New Forest. REPD does not record the planning grant date. Operator of record: New Forest Energy (formerly Somerley Estate).

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
New Forest Energy (formerly Somerley Estate)
New Forest
Authority
England

Planning and build timeline

Application submitted30 November 2017
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

New Forest approves 80% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land Adj Harmer Warren Quarry’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

New Forest’s record on battery storage

New Forest has decided 5 battery storage schemes and approved 80%, taking a median of 4.3 months. See every battery storage scheme decision in New Forest

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
230.4 km
Solar Photovoltaics · Operational
53 km
Solar Photovoltaics · Operational
20.45.5 km
Solar Photovoltaics · Operational
13.25.8 km
Solar Photovoltaics · Operational
136.8 km
Battery · Under Construction
49.97.6 km
Solar Photovoltaics · Operational
410 km
Solar Photovoltaics · Operational
3610.6 km

How big is Land Adj Harmer Warren Quarry?

Land Adj Harmer Warren Quarry has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land Adj Harmer Warren Quarry?

REPD records the operator as New Forest Energy (formerly Somerley Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land Adj Harmer Warren Quarry approved and built?

The application was submitted on 30 November 2017. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7143.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode