Novarly ParcelRenewable sites

Renewable sitesHomeland Solar Farm

Homeland Solar Farm

Homeland Solar Farm is an operational 13.2 MW solar farm in Dorset, generating since 1 March 2014. Planning permission was granted on 8 October 2013, 4 months after submission. Operator of record: Foresight.

13.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2014
Solar Photovoltaics
Technology
Foresight
Dorset
Authority
England

Planning and build timeline

Application submitted28 May 2013
Permission granted8 October 2013
4 months after submission
Operational1 March 2014
5 months after consent

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Homeland Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
20.42.4 km
Battery · Under Construction
49.92.6 km
Solar Photovoltaics · Operational
133 km
Solar Photovoltaics · Operational
44.9 km
Solar Photovoltaics · Operational
75.3 km
Solar Photovoltaics · Operational
365.7 km
Battery · Under Construction
105.8 km
Solar Photovoltaics · Under Construction
236.1 km

How big is Homeland Solar Farm?

Homeland Solar Farm has a recorded installed capacity of 13.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Homeland Solar Farm?

REPD records the operator as Foresight. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Homeland Solar Farm approved and built?

The application was submitted on 28 May 2013. Permission was granted on 8 October 2013, 4 months later. The site became operational on 1 March 2014, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1761.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode