Bedborough Farm

Bedborough Farm is an operational 7 MW solar farm in Dorset, generating since 26 February 2016. Planning permission was granted on 3 November 2014, 3 months after submission. Operator of record: Solstice Renewables Ltd.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 26 February 2016
Solar Photovoltaics
Technology
Solstice Renewables Ltd
Dorset
Authority
England

Planning and build timeline

Application submitted14 August 2014
Permission granted3 November 2014
3 months after submission
Operational26 February 2016
16 months after consent

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bedborough Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.93.8 km
Solar Photovoltaics · Operational
44.5 km
Solar Photovoltaics · Operational
135.2 km
Solar Photovoltaics · Operational
205.3 km
Solar Photovoltaics · Operational
13.25.3 km
Solar Photovoltaics · Operational
365.4 km
Hydrogen · Operational
0.95.6 km
Battery · Operational
5.6 km

How big is Bedborough Farm?

Bedborough Farm has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bedborough Farm?

REPD records the operator as Solstice Renewables Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bedborough Farm approved and built?

The application was submitted on 14 August 2014. Permission was granted on 3 November 2014, 3 months later. The site became operational on 26 February 2016, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2114.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode