Wisbech Solar Farm
Wisbech Solar Farm is operational in Fenland with a recorded capacity of 3.5 MW, and has been generating since 2015-12-15.
Planning and build timeline
| Application submitted | 2014-10-24 |
| Permission granted | 2015-01-21 3 months after submission |
| Operational | 2015-12-15 11 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Fenland’s record on solar
Fenland has decided 22 solar farms and approved 91%, taking a median of 2.8 months. See every solar farm decision in Fenland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Coldham Hall Wind Onshore · Operational | 14 | 5 km |
Volmary Site Solar Photovoltaics · Operational | 0.2 | 5.1 km |
Whitemill Wind Farm Wind Onshore · Operational | 14 | 5.2 km |
Coldham Wind Onshore · Operational | 16 | 6.4 km |
MARCH SEWAGE TREATMENT WORKS - WIND TURBINE Wind Onshore · Operational | 2 | 7.9 km |
Stags Holt Wind Onshore · Operational | 18 | 8 km |
Stags Holt Extension Wind Onshore · Operational | 2 | 8 km |
Rose And Crown Farm Solar Photovoltaics · Operational | 30 | 8.6 km |
How big is Wisbech Solar Farm?
Wisbech Solar Farm has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Wisbech Solar Farm?
REPD records the operator as British Solar Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Wisbech Solar Farm approved and built?
The application was submitted on 2014-10-24. Permission was granted on 2015-01-21, 3 months later. The site became operational on 2015-12-15, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4736.