Renewable sites › Vine Street EfW
Vine Street EfW
Vine Street EfW is an operational 9.5 MW energy-from-waste plant in Kirklees, generating since 1 January 2000. REPD does not record the planning grant date. Operator of record: SITA UK.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 January 2000 |
Screening a site of your own?
Redline runs the record on your own boundary in Kirklees: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Vine Street EfW’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 0.31 | 0.8 km |
Battery · Under Construction | 0.25 | 12.8 km |
Wind Onshore · Operational | 7.5 | 13.5 km |
Landfill Gas · Operational | 1 | 13.6 km |
Wind Onshore · Operational | 6 | 14.2 km |
Wind Onshore · Operational | 6.9 | 14.5 km |
Solar Photovoltaics · Under Construction | — | 14.7 km |
Solar Photovoltaics · Operational | 5 | 14.9 km |
How big is Vine Street EfW?
Vine Street EfW has a recorded installed capacity of 9.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Vine Street EfW?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Vine Street EfW approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 January 2000.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 843.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode