Renewable sites › Vine Street EfW
Vine Street EfW
Vine Street EfW is operational in Kirklees with a recorded capacity of 9.5 MW, and has been generating since 2000-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2000-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
United Anodisers, Red Doles Lane - Solar Panels Solar Photovoltaics · Under Construction | 0.31 | 0.8 km |
Holmfield - Battery Energy Storage Battery · Under Construction | 0.25 | 12.8 km |
Blackstone Edge Wind Onshore · Operational | 7.5 | 13.5 km |
Soothills Landfill Landfill Gas · Operational | 1 | 13.6 km |
Hazlehead Wind Onshore · Operational | 6 | 14.2 km |
Spicer Hill Wind Farm Wind Onshore · Operational | 6.9 | 14.5 km |
Trafalgar House Police Station - Installation Of Solar PV System Solar Photovoltaics · Under Construction | — | 14.7 km |
Haigh Hall Solar Farm Solar Photovoltaics · Operational | 5 | 14.9 km |
How big is Vine Street EfW?
Vine Street EfW has a recorded installed capacity of 9.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Vine Street EfW?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Vine Street EfW approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2000-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 843.