Novarly ParcelRenewable sites

Renewable sitesSoothills Landfill

Soothills Landfill

Soothills Landfill is operational in Kirklees with a recorded capacity of 1 MW, and has been generating since 2004-01-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-01-01
Landfill Gas
Technology
ONYX LANDFILL LTD
Kirklees
Authority
England

Planning and build timeline

Application submitted1999-03-10
Permission granted1999-11-05
8 months after submission
Operational2004-01-01
50 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Haigh Hall Solar Farm
Solar Photovoltaics · Operational
52 km
LVF Packaging - Solar Panel
Solar Photovoltaics · Operational
0.38.7 km
TF and JH Braime Holdings Factory
Solar Photovoltaics · Operational
0.28.9 km
Knostrop WWTW AD
Anaerobic Digestion · Operational
2.49.2 km
Skelton Grange � Energy Recovery Facility
EfW Incineration · Under Construction
499.4 km
Knostrop Sewage Treatment Works
Anaerobic Digestion · Operational
410.1 km
Cross Green ERF
EfW Incineration · Operational
11.610.1 km
Regent Street, Sheepscar - Solar Panels
Solar Photovoltaics · Operational
0.2210.4 km

How big is Soothills Landfill?

Soothills Landfill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Soothills Landfill?

REPD records the operator as ONYX LANDFILL LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Soothills Landfill approved and built?

The application was submitted on 1999-03-10. Permission was granted on 1999-11-05, 8 months later. The site became operational on 2004-01-01, 50 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 622.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council