Hazlehead is an operational 6 MW onshore wind farm in Barnsley, generating since 16 December 2011. Planning permission was granted on 8 March 2007, 6 months after submission. Operator of record: Banks Renewables.
Planning and build timeline
| Application submitted | 5 September 2006 |
| Permission granted | 8 March 2007 6 months after submission |
| Operational | 16 December 2011 57 months after consent |
Screening a site of your own?
Barnsley approves 71% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hazlehead’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
- Green Belt — Barnsley
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Barnsley’s record on onshore wind
Barnsley has decided 7 onshore wind schemes and approved 71%, taking a median of 8.6 months. See every onshore wind scheme decision in Barnsley →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 7.5 | 2.1 km |
Wind Onshore · Operational | 6.9 | 2.7 km |
Wind Onshore · Operational | 5.9 | 4.1 km |
EfW Incineration · Operational | 9.5 | 14.2 km |
Solar Photovoltaics · Under Construction | 0.31 | 14.6 km |
Biomass (dedicated) · Operational | 9 | 14.9 km |
How big is Hazlehead?
Hazlehead has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hazlehead?
REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hazlehead approved and built?
The application was submitted on 5 September 2006. Permission was granted on 8 March 2007, 6 months later. The site became operational on 16 December 2011, 57 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3937.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode