Novarly ParcelRenewable sites

Renewable sitesHazlehead

Hazlehead

Hazlehead is operational in Barnsley with a recorded capacity of 6 MW, and has been generating since 2011-12-16.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-12-16
Wind Onshore
Technology
Banks Renewables
Barnsley
Authority
England

Planning and build timeline

Application submitted2006-09-05
Permission granted2007-03-08
6 months after submission
Operational2011-12-16
57 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on onshore wind

Barnsley has decided 7 onshore wind schemes and approved 71%, taking a median of 8.6 months. See every onshore wind scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Blackstone Edge
Wind Onshore · Operational
7.52.1 km
Spicer Hill Wind Farm
Wind Onshore · Operational
6.92.7 km
Royd Moor
Wind Onshore · Operational
5.94.1 km
Vine Street EfW
EfW Incineration · Operational
9.514.2 km
United Anodisers, Red Doles Lane - Solar Panels
Solar Photovoltaics · Under Construction
0.3114.6 km
Barnsley 1.5
Biomass (dedicated) · Operational
914.9 km

How big is Hazlehead?

Hazlehead has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hazlehead?

REPD records the operator as Banks Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hazlehead approved and built?

The application was submitted on 2006-09-05. Permission was granted on 2007-03-08, 6 months later. The site became operational on 2011-12-16, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3937.

Novarly Parcel · official public data, read properly · parcel.novarly.com