Novarly ParcelRenewable sites

Renewable sitesTrafalgar House Police Station - Installation Of Solar PV System

Trafalgar House Police Station - Installation Of Solar PV System

Trafalgar House Police Station - Installation Of Solar PV System is under construction in Bradford.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Yorkshire and Humber Police Procurement
Bradford
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bradford’s record on solar

Bradford has decided 26 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Bradford

Other built sites within 15 km

SiteMWDistance
Morrisons, Bradford Road, Idle - Solar PV Panels
Solar Photovoltaics · Operational
0.84.3 km
Esholt WWTW
Sewage Sludge Digestion · Operational
37 km
Bradford West Substation (Harrop Edge Farm)
Battery · Under Construction
49.97.6 km
Holmfield - Battery Energy Storage
Battery · Under Construction
0.258.2 km
Ovenden Moor (Repower)
Wind Onshore · Operational
1812 km
Soothills Landfill
Landfill Gas · Operational
112.7 km
Buslingthorpe Power Station (Leeds North)
Biomass (dedicated) · Operational
214.1 km
United Anodisers, Red Doles Lane - Solar Panels
Solar Photovoltaics · Under Construction
0.3114.2 km

How big is Trafalgar House Police Station - Installation Of Solar PV System?

REPD does not record an installed capacity for Trafalgar House Police Station - Installation Of Solar PV System.

Who operates Trafalgar House Police Station - Installation Of Solar PV System?

REPD records the operator as Yorkshire and Humber Police Procurement. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Trafalgar House Police Station - Installation Of Solar PV System approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14725.