Renewable sites › United Anodisers, Red Doles Lane - Solar Panels
United Anodisers, Red Doles Lane - Solar Panels
United Anodisers, Red Doles Lane - Solar Panels is a 0.31 MW solar farm under construction in Kirklees. REPD does not record the planning grant date. Operator of record: United Anodisers.
Planning and build timeline
| Application submitted | 9 December 2022 |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Kirklees approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with United Anodisers, Red Doles Lane - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Kirklees’s record on solar
Kirklees has decided 20 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Kirklees →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 9.5 | 0.8 km |
Battery · Under Construction | 0.25 | 12.7 km |
Landfill Gas · Operational | 1 | 12.8 km |
Wind Onshore · Operational | 7.5 | 13.7 km |
Solar Photovoltaics · Operational | 5 | 14.2 km |
Solar Photovoltaics · Under Construction | — | 14.2 km |
Wind Onshore · Operational | 6 | 14.6 km |
Wind Onshore · Operational | 6.9 | 14.7 km |
How big is United Anodisers, Red Doles Lane - Solar Panels?
United Anodisers, Red Doles Lane - Solar Panels has a recorded installed capacity of 0.31 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates United Anodisers, Red Doles Lane - Solar Panels?
REPD records the operator as United Anodisers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was United Anodisers, Red Doles Lane - Solar Panels approved and built?
The application was submitted on 9 December 2022. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12927.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode