Spicer Hill Wind Farm

Spicer Hill Wind Farm is an operational 6.9 MW onshore wind farm in Barnsley, generating since 15 February 2013. Planning permission was granted on 1 April 2010, 11 months after submission. Operator of record: J G Pears Limited.

6.9 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2013
Wind Onshore
Technology
J G Pears Limited
Barnsley
Authority
England

Planning and build timeline

Application submitted27 April 2009
Permission granted1 April 2010
11 months after submission
Operational15 February 2013
35 months after consent

Screening a site of your own?

RedlineUK · £39

Barnsley approves 71% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Spicer Hill Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Barnsley’s record on onshore wind

Barnsley has decided 7 onshore wind schemes and approved 71%, taking a median of 8.6 months. See every onshore wind scheme decision in Barnsley

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
7.51.2 km
Wind Onshore · Operational
5.91.6 km
Wind Onshore · Operational
62.7 km
Biomass (dedicated) · Operational
912.3 km
EfW Incineration · Operational
9.514.5 km
Solar Photovoltaics · Under Construction
0.3114.7 km

How big is Spicer Hill Wind Farm?

Spicer Hill Wind Farm has a recorded installed capacity of 6.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Spicer Hill Wind Farm?

REPD records the operator as J G Pears Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Spicer Hill Wind Farm approved and built?

The application was submitted on 27 April 2009. Permission was granted on 1 April 2010, 11 months later. The site became operational on 15 February 2013, 35 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2680.