Renewable sites › VENTNOR ROAD SOLAR PARK
VENTNOR ROAD SOLAR PARK
VENTNOR ROAD SOLAR PARK is an operational 4.8 MW solar farm in Isle of Wight, generating since 23 March 2013. Planning permission was granted on 21 December 2012, 2 months after submission. Operator of record: BNRG Renewables.
Planning and build timeline
| Application submitted | 9 October 2012 |
| Permission granted | 21 December 2012 2 months after submission |
| Operational | 23 March 2013 3 months after consent |
Screening a site of your own?
Isle of Wight approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with VENTNOR ROAD SOLAR PARK’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Isle of Wight’s record on solar
Isle of Wight has decided 16 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Isle of Wight →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 10.6 | 4.9 km |
Anaerobic Digestion · Operational | 2.2 | 5.1 km |
Solar Photovoltaics · Operational | 10.2 | 8 km |
Solar Photovoltaics · Operational | 6 | 8.8 km |
Solar Photovoltaics · Operational | 7.3 | 9 km |
Anaerobic Digestion · Operational | 1 | 10.7 km |
Advanced Conversion Technologies · Under Construction | 3.3 | 11.5 km |
Landfill Gas · Operational | 1.5 | 12.3 km |
How big is VENTNOR ROAD SOLAR PARK?
VENTNOR ROAD SOLAR PARK has a recorded installed capacity of 4.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates VENTNOR ROAD SOLAR PARK?
REPD records the operator as BNRG Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was VENTNOR ROAD SOLAR PARK approved and built?
The application was submitted on 9 October 2012. Permission was granted on 21 December 2012, 2 months later. The site became operational on 23 March 2013, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1096.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode