Novarly ParcelRenewable sites

Renewable sitesHill Farm Solar Park

Hill Farm Solar Park

Hill Farm Solar Park is operational in Isle of Wight with a recorded capacity of 10.2 MW, and has been generating since 2014-05-30.

10.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-05-30
Solar Photovoltaics
Technology
Lightsource Renewable Energy (BNRG Renewables)
Isle of Wight
Authority
England

Planning and build timeline

Application submitted2012-10-05
Permission granted2013-01-29
4 months after submission
Operational2014-05-30
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Isle of Wight’s record on solar

Isle of Wight has decided 16 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Isle of Wight

Other built sites within 15 km

SiteMWDistance
East Fairlee
Solar Photovoltaics · Operational
7.31.5 km
VENTNOR ROAD SOLAR PARK
Solar Photovoltaics · Operational
4.88 km
Fieldscale
Solar Photovoltaics · Operational
10.68.3 km
Gore Cross - AD
Anaerobic Digestion · Operational
2.28.8 km
Grange Farm
Solar Photovoltaics · Operational
69.2 km
Greenhill Anaerobic Digestion Plant
Anaerobic Digestion · Operational
111.4 km
Chawton Farm Solar Farm
Solar Photovoltaics · Operational
3.212.7 km
MMD Shipping Services
Solar Photovoltaics · Operational
1.212.9 km

How big is Hill Farm Solar Park?

Hill Farm Solar Park has a recorded installed capacity of 10.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hill Farm Solar Park?

REPD records the operator as Lightsource Renewable Energy (BNRG Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hill Farm Solar Park approved and built?

The application was submitted on 2012-10-05. Permission was granted on 2013-01-29, 4 months later. The site became operational on 2014-05-30, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1758.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council